ELE15-01348
| Final | 11/18/2016 | 11/18/2016 | 11/18/2016 2:22:46 PM | P | CANC |
|
|
Call Brandon for levels 1 though 4 Annex and level 1 stack 1 office. Phone #: ###-#### Inspection requested via web by Tom Betty Contractor asked to cancel due to flood. Will recall when ready.
|
ELE16-01838
| Final | 11/18/2016 | 11/18/2016 | 11/18/2016 2:20:27 PM | P | CANC |
|
|
Call Brandon for TI final levels 1 through 4 Annex and level 1 stack 1 Office. Phone #: ###-#### Inspection requested via web by Tom Betty Contractor asked to cancel due to flood. Will recall when ready
|
ELE14-03316
| Electrical Rough-In | 11/17/2016 | 11/18/2016 | 11/18/2016 2:17:59 PM | A | PASS |
|
|
Garbage Compactors Motor Disconnects and Controllers and Container Winch Motor Disconnects and Controllers @ Loading Dock Phone #: ###-#### Inspection requested via web by Tom Betty Rough in ok. Will check flexible cord when controls mounted where needed.
|
ELE15-01348
| Electrical Rough-In | 11/17/2016 | 11/18/2016 | 11/18/2016 11:44:55 AM | A | PASS |
|
|
Call Brandon for 11:00 a.m. rough in of north exterior columns. Phone #: ###-#### Inspection requested via web by Tom Betty N.E. columns rough in ok cover
|
ELE16-03763
| Electrical Rough-In | 11/17/2016 | 11/18/2016 | 11/18/2016 9:32:04 AM | A | PASS |
|
|
Partial ug ; bonding for in-gtound hot tub. UG for: (1) LV light, (1) autocover motor Bonding for: (4) EQ plane corners, (1) steel/ equipment, (2) autocover, (1) water (in skimmer) Phone #: ###-#### Inspection requested via web by Lars Johnson Underground stubs out of tub shell and bonding noted rough in ok cover
|