ELE19-01628
| Electrical Rough-In | 11/18/2019 | 11/18/2019 | 11/18/2019 2:44:34 PM | P | PASS |
|
|
This request is for an inspection of the 3rd floor corridor. Please call jerry with any questions ###-#### Phone #: ###-#### Inspection requested via web by Darryn Coburn 3rd floor hard lids in corridor ok to cover
|
ELE19-04429
| Rough-In Permanent Service | 11/17/2019 | 11/18/2019 | 11/18/2019 1:48:18 PM | A | PASS |
|
|
Code is 8008. Access from the back of the house, the back door is open. Thank you. Phone #: ###-#### Inspection requested via web by Nermin Bobaric Kitchen,bath adn back room-other rooms new light fixtures ok to cover p/s o/h rec ok
|
ELE17-02716
| Final | 11/15/2019 | 11/18/2019 | 11/18/2019 1:35:58 PM | P | PASS |
|
|
Please call if you have any questions. House is empty but staged. Lock box code is 3517 Phone #: ###-#### Inspection requested via web by Dustin Kuester Final ok
|
ELE18-03750
| Final | 11/15/2019 | 11/18/2019 | 11/18/2019 1:35:37 PM | P | PASS |
|
|
Please call if you have any questions. House is empty but staged. Lock box code is 3517 Phone #: ###-#### Inspection requested via web by Dustin Kuester Final ok
|
ELE19-04457
| Electrical Rough-In | 11/17/2019 | 11/18/2019 | 11/18/2019 1:33:35 PM | A | PASS |
|
|
For access please call Ed 2/2 hr prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Terry Scott Basement ok to cover
|
ELE19-04456
| Permanent Service | 11/17/2019 | 11/18/2019 | 11/18/2019 12:59:59 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jerry Moore p/s o/h n ok
|
ELE19-04369
| Final | 11/15/2019 | 11/18/2019 | 11/18/2019 12:42:43 PM | P | PASS |
|
|
Install complete per approved plans; the stamped and approved plans are on site at the solar disconnect; For any questions about the work done for this project, call Jed at ###-####; For any questions about the plans or design, call Ryan at ###-####; thanks guys
The homeowner will be there to give access to the garage and you can give him a call on your way over at ###-#### Phone #: ###-#### Inspection requested via web by Ryan King Final ok
|
ELE19-04442
| Electrical Rough-In | 11/15/2019 | 11/18/2019 | 11/18/2019 9:50:34 AM | A | PASS |
|
|
Back porch Phone #: ###-#### Inspection requested via web by Jake Cutler Back patio ceiling ok to cover
|
ELE19-03943
| Electrical Rough-In | 11/17/2019 | 11/18/2019 | 11/18/2019 9:19:06 AM | A | PASS |
|
|
Please call ahead Phone #: ###-#### Inspection requested via web by Kyle Dillon U/G for new service conduit to meter and to house panel ok to cover
|