BLD19-04005
| BLD-Final | 11/13/2019 | 11/18/2019 | 11/18/2019 3:49:51 PM | P | CANC |
|
|
Sydney Phone #: ###-####
|
BLD19-00559
| BLD-Footing | 11/17/2019 | 11/18/2019 | 11/18/2019 3:49:40 PM | P | NR |
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru
|
BLD19-04027
| BLD-Foundation | 11/18/2019 | 11/18/2019 | 11/18/2019 3:20:32 PM | P | PASS |
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru
|
BLD19-03277
| BLD-Framing/Rough-in | 11/18/2019 | 11/18/2019 | 11/18/2019 2:50:14 PM | P | PART |
|
|
Matt Phone #: ###-####. Interior steel stud framed walls and hardlids for new restroom. Mech. permit required for vent. fans in restroom and inspected prior to cover.
|
BLD19-02103
| BLD-Final | 11/18/2019 | 11/18/2019 | 11/18/2019 2:31:12 PM | P | PASS |
|
|
Daniel Phone #: ###-####
|
BLD19-02103
| DOC - Permit Finaled | 11/18/2019 | 11/18/2019 | 11/18/2019 2:31:05 PM | P | PASS |
|
|
|
BLD19-01141
| BLD-Energy code compliance | 11/15/2019 | 11/18/2019 | 11/18/2019 1:53:17 PM | P | PASS |
|
|
Alex Phone #: ###-####
|
BLD19-03521
| BLD-Framing/Rough-in | 11/18/2019 | 11/18/2019 | 11/18/2019 1:26:29 PM | P | PASS |
|
|
Sid Phone #: ###-####. Interior steel stud framed walls. Also the in progress work for the 2hr. fire barrier walls.
|
BLD19-04246
| BLD-Final | 11/15/2019 | 11/18/2019 | 11/18/2019 10:23:45 AM | A | PASS |
|
|
Jennifer Phone #: ###-####
|
BLD18-03478
| BLD-Other | 11/15/2019 | 11/18/2019 | 11/18/2019 9:36:32 AM | A | FAIL |
|
|
block and tie- Randy Phone #: ###-####. Needs to fix address. Space 19 already has a completed coach.
|
BLD19-03533
| BLD-Final | 11/17/2019 | 11/18/2019 | 11/18/2019 9:11:19 AM | P | CANC |
|
|
Mike,
Victor from brs said he spoke to Brian the reviewer and he said there was no mechanical comments and we should be okay to do finals. Call me if you still have questions. Code is 0912. Troy is scheduled for the morning. Thanks, Todd
Todd Phone #: ###-#### >> Inspection requested via web by Todd Kurns Inspection cancelled from web by: Todd Kurns
|
BLD19-00733
| BLD-Framing/Rough-in | 11/15/2019 | 11/18/2019 | 11/18/2019 9:08:03 AM | A | FAIL |
|
|
Kevin Phone #: ###-####. Complete airseal. Complete fireblocking. repair all broken floor joist, justify holes drilled into beams. Tempered glazing required at window by tub upstairs, and by french doors. strap all cut double top plates.
|
BLD19-03707
| BLD-Footing | 11/15/2019 | 11/18/2019 | 11/18/2019 8:35:12 AM | A | PASS |
|
|
Amy Phone #: ###-####
|
BLD19-04348
| BLD-Framing/Rough-in | 11/15/2019 | 11/18/2019 | 11/18/2019 8:22:01 AM | A | CANC |
|
|
Alan Phone #: ###-####
|
BLD19-04348
| BLD-Wall Bracing | 11/18/2019 | 11/18/2019 | 11/18/2019 8:22:01 AM | A | PASS |
|
|
Alan Phone #: ###-####
|