MEC97-03405
| INSP - Framing/ Rough-in | 11/19/1997 | 11/19/1997 | 11/20/1997 12:00:00 AM | P | PASS |
|
|
11/19/97 342 - rein
|
MEC97-03443
| INSP - Gas pressure test | 11/19/1997 | 11/19/1997 | 11/19/1997 12:00:00 AM | | PASS |
|
|
/ / 342 -
|
BLD97-02601
| INSP - Framing/Rough-in | 11/18/1997 | 11/19/1997 | 11/19/1997 12:00:00 AM | A | FAIL |
|
|
11/18/97 342 - finish bcec, truss eng, pt ld transfers, post connections
|
BLD97-03046
| INSP - Footings | 11/18/1997 | 11/19/1997 | 11/19/1997 12:00:00 AM | A | PASS |
|
|
11/18/97 342 - need approved plan on site at foundation, ftg looks ok
|
MEC97-03244
| INSP - Framing/ Rough-in | 11/19/1997 | 11/19/1997 | 11/19/1997 12:00:00 AM | P | PASS |
|
|
11/19/97 342 - Scheduled by Hello! on 11/19/97 at 08:26:39.
|
BLD97-02999
| INSP - Footings | 11/19/1997 | 11/19/1997 | 11/19/1997 12:00:00 AM | P | PASS |
|
|
11/19/97 342 -
|
MEC97-03443
| INSP - Retro Fit (check note) | 11/19/1997 | 11/19/1997 | 11/19/1997 12:00:00 AM | P | PART |
|
|
11/19/97 342 - AFTER 4:00 PLEASE...NO LIGHT IN BASEMENT, INSULATION ON B EXHAUST DUCT FOR FORCED DRAFT SYSTEM, SPECS COMING TO BOB
|
BLD97-01449
| INSP - Final | 11/19/1997 | 11/19/1997 | 11/19/1997 12:00:00 AM | P | FAIL |
|
|
11/19/97 342 - back door open not french doors.\\mech is finaled...BUT N TO FINISH SCOPE OF WORK, TEMP GLASS W/IN 24" OF DOOR, WEATHER PROOF, ETC
|
BLD97-01567
| INSP - Conference | 11/19/1997 | 11/19/1997 | 11/19/1997 12:00:00 AM | P | PART |
|
|
11/19/97 342 - 3:30 pm
|
MEC97-03411
| INSP - Framing/ Rough-in | 11/19/1997 | 11/19/1997 | 11/19/1997 12:00:00 AM | P | PASS |
|
|
11/19/97 342 -
|
MEC97-03428
| INSP - Retro Fit (check note) | 11/18/1997 | 11/19/1997 | 11/19/1997 12:00:00 AM | P | NR |
|
|
11/18/97 342 - gas log set and gas piping....not ready at 2pm
|
MEC97-03432
| INSP - Retro Fit (check note) | 11/19/1997 | 11/19/1997 | 11/19/1997 12:00:00 AM | P | PASS |
|
|
11/19/97 342 - GAS LINE TO F/P
|