Inspections for the day of: Monday, November 19, 2001.
Number of inspections: 26
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02083 BLD-Aging Inspection11/19/200111/19/200111/19/2001 12:00:00 AM PART
wip 11/19/2001 9:29:17 AM
BLD01-01660 BLD-Aging Inspection11/19/200111/19/200111/19/2001 12:00:00 AM PART
wip? 11/19/2001 9:31:48 AM
BLD01-00977 BLD-Aging Inspection11/19/200111/19/200111/19/2001 12:00:00 AM FAIL
exp 11/19/2001 9:30:48 AM
BLD01-00164 BLD-Aging Inspection11/19/200111/19/200111/19/2001 12:00:00 AM FAIL
exp 11/19/2001 9:33:23 AM
BLD01-00174 BLD-Aging Inspection11/19/200111/19/200111/19/2001 12:00:00 AM FAIL
exp 11/19/2001 9:33:45 AM
BLD01-00976 BLD-Aging Inspection11/19/200111/19/200111/19/2001 12:00:00 AM PART
wip 11/19/2001 9:31:35 AM
BLD01-01019 BLD-Aging Inspection11/19/200111/19/200111/19/2001 12:00:00 AM PART
wip? 11/19/2001 9:31:19 AM
BLD01-02371 BLD-Aging Inspection11/19/200111/19/200111/19/2001 12:00:00 AM PART
wip 11/19/2001 9:32:13 AM
BLD01-01380 BLD-Aging Inspection11/19/200111/19/200111/19/2001 12:00:00 AM PART
wip 11/19/2001 9:32:02 AM
BLD01-01666 BLD-Aging Inspection11/19/200111/19/200111/19/2001 12:00:00 AM PART
wip? 11/19/2001 9:34:00 AM
BLD01-02273 BLD-Aging Inspection11/19/200111/19/200111/19/2001 12:00:00 AM PART
wip 11/19/2001 9:29:30 AM
BLD01-01086 BLD-Framing/Rough-in11/16/200111/19/200111/19/2001 12:00:00 AMAPART
###-#### JOHN
need mech. sign off, draft stop chase, strap top plates, criples above header, air seal package, ok to insulate 11/19/2001 10:12:32 AM
BLD01-02314 BLD-Final11/16/200111/19/200111/19/2001 12:00:00 AMAPASS
DEAN ###-####
c of c issued 11/19/2001 9:44:21 AM
BLD01-01014 BLD-Final11/16/200111/19/200111/19/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/16/2001 at 12:27:12. Contact: ###-####.
ok as long as others are ok 11/19/2001 10:26:20 AM
BLD01-02840 BLD-Framing/Rough-in11/16/200111/19/200111/19/2001 12:00:00 AMAPASS
###-####- david fr
BLD01-01275 BLD-Final11/16/200111/19/200111/19/2001 12:00:00 AMANH
Scheduled by Inspector: 415 On 11/16/2001 3:45:04 PM call 1st
BLD01-02528 BLD-Footing11/16/200111/19/200111/19/2001 12:00:00 AMANR
###-####
BLD01-02429 BLD-Final11/16/200111/19/200111/19/2001 12:00:00 AMPNR
mike ###-#### fn
won't be ready untill tues. per mike, no inspection made 11/19/2001 3:00:51 PM
BLD01-02600 BLD-Framing/Rough-in11/16/200111/19/200111/19/2001 12:00:00 AMPCANC
###-#### LON 11-19-01 LON CALLED IN TO CANC THIS INSPECTION AS HE WAS NOT QUITE READY SO HE SET UP ANOTHER ONE FOR 11-20-01 //DLD
BLD01-02054 BLD-Framing/Rough-in11/16/200111/19/200111/19/2001 12:00:00 AMPFAIL
###-#### JAMES SHEER NAIL
need letter from str. engineer approving shear as built///c/n posted 11/19/2001 2:36:11 PM
BLD01-02829 BLD-Footing11/19/200111/19/200111/19/2001 12:00:00 AMPPART
###-#### RANDY
wip, not ready all the way 11/19/2001 1:20:01 PM
BLD01-01287 BLD-Framing/Rough-in11/19/200111/19/200111/19/2001 12:00:00 AMPPASS
###-#### JOHN
ok for perm occ. 11/19/2001 3:45:18 PM
BLD01-01288 BLD-Framing/Rough-in11/19/200111/19/200111/19/2001 12:00:00 AMPPASS
###-#### JOHN
ok for perm occ 11/19/2001 3:44:48 PM
BLD01-02811 BLD-Framing/Rough-in11/19/200111/19/200111/19/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/19/2001 at 10:06:19. Contact: ###-####.
ok to cover, need mech. rouph, also temp. glass w/in 24" of doors by final 11/19/2001 1:35:17 PM
BLD01-02925 BLD-Footing11/19/200111/19/200111/19/2001 12:00:00 AMPPART
###-#### NICK
wip, pending soil report and instructions 11/19/2001 2:12:17 PM
BLD01-02499 BLD-Conference11/19/200111/19/200111/19/2001 12:00:00 AMPPASS
gerry hill ###-#### 11/19/2001 10:57:11 AM
statis on permit 11/20/2001 11:24:57 AM