FIR03-00290
| INSP-Final Inspection | 11/19/2003 | 11/19/2003 | 11/19/2003 12:00:00 AM | A | PASS |
|
|
fire sprinklers finaled
|
FIR03-00388
| INSP-Final Inspection | 11/19/2003 | 11/19/2003 | 11/19/2003 12:00:00 AM | A | PART |
|
|
temporary occupancy given with dave millers permission until the fire alarm notification circuit has been synced
|
BLD03-00379
| FIRE-Final Inspection | 11/18/2003 | 11/19/2003 | 11/19/2003 12:00:00 AM | A | PART |
|
|
temporary occupancy given with dave millers permission until the fire alarm notification circuit has been synced 11/19/2003 9:19:54 AM
|
FIR03-00600
| INSP-Sprinkler Rough-in/Hydro | 11/19/2003 | 11/19/2003 | 11/19/2003 12:00:00 AM | P | PASS |
|
|
hydro test on the fdc is ok and hydro on the anit-freeze system at the shop is ok 11/19/2003 3:48:30 PM
|
FIR03-00571
| INSP-Supply line flush | 11/18/2003 | 11/19/2003 | 11/19/2003 12:00:00 AM | P | PASS |
|
|
Underground hydro test is ok 11/19/2003 3:24:56 PM
|
FIR03-00639
| INSP-Sprinkler Rough-in | 11/19/2003 | 11/19/2003 | 11/19/2003 12:00:00 AM | P | PART |
|
|
hardlid on the first floor are ok to cover 11/19/2003 3:26:11 PM
|
BLD01-01557
| FIRE-Final Inspection | 11/19/2003 | 11/19/2003 | 11/19/2003 12:00:00 AM | P | FAIL |
|
|
DINO; Phone #: ###-#### I went over the approved plans with Dino and pointed out all of the notes that needed to be followed and showed him the sprinkler pendants that exceed 130 sq.ft. 11/19/2003 4:30:22 PM
|