BLD04-01984
| BLD-Final | 11/18/2004 | 11/19/2004 | 11/19/2004 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 11/18/2004 at 10:25:41 AM. Contact: ###-####.
need final insp's by plumbing, mech., and fire prior to bldg final. 11/19/2004 3:02:16 PM
|
MEC04-03196
| Rough-in | 11/18/2004 | 11/19/2004 | 11/19/2004 12:00:00 AM | P | FAIL |
|
|
Engineer says economizers are large enough for make up air needed. Gas line is upsized as per engineer's drawings. Please do pressure test as well.; Phone #: ###-#### Internet Inspection Request from: Wade Huskey
28 psi 11/19/2004 1:47:17 PM
c/n posted. need 60 psi test 11/19/2004 1:55:19 PM
|
BLD04-00690
| BLD-Other | 11/19/2004 | 11/19/2004 | 11/19/2004 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/19/2004 at 7:06:13 AM. Contact: ###-####.
recheck additional support wires @ ceiling grid for ceiling accessory supports. 11/19/2004 2:51:48 PM
|
MEC04-03254
| Final | 11/19/2004 | 11/19/2004 | 11/19/2004 12:00:00 AM | P | PASS |
|
|
Pressure test only. Please inspect early afternoon. House is unoccupied and will be unlocked. Please do not walk on hardwood floor in living room, it has just been refinished. Call with any problems. Thanks, April.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
27 psi. 11/19/2004 12:52:51 PM
|
MEC04-02976
| Rough-in | 11/19/2004 | 11/19/2004 | 11/19/2004 12:00:00 AM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
c/n on site 11/19/2004 12:39:24 PM
|
MEC04-02976
| Pressure Test | 11/19/2004 | 11/19/2004 | 11/19/2004 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
27 psi. 11/19/2004 12:36:34 PM
|
MEC04-02530
| Final | 11/19/2004 | 11/19/2004 | 11/19/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/19/2004 at 10:18:30 AM. Contact: ###-####.
|