FIR08-00585
| FIR-Aging Inspection | 11/19/2008 | 11/19/2008 | 11/20/2008 10:12:10 AM | | DONE |
|
|
Work in progress
|
BLD08-01828
| FIRE-Conference | 11/19/2008 | 11/19/2008 | 11/19/2008 3:21:18 PM | P | DONE |
|
|
Site conference regarding final inspection requirements including project related building permit fire life safety issues.
|
BLD08-00593
| FIRE-Final Inspection | 11/19/2008 | 11/19/2008 | 11/19/2008 3:19:59 PM | P | PASS |
|
|
Shell permit fire life safety inspection passed.
|
BLD08-02140
| FIRE-Final Inspection | 11/19/2008 | 11/19/2008 | 11/19/2008 2:19:00 PM | P | PASS |
|
|
Life safety completed. Fire extinguisher needs new cert tag, structual inspector will verify new tag on fire extinguisher during structual final. KR
|
FIR08-00714
| INSP-Final Inspection | 11/18/2008 | 11/19/2008 | 11/19/2008 2:12:10 PM | P | PART |
|
|
OH fire sprinkler system modifications at the tenant remodel area are okay for cover at the drop ceilings.
|
BLD08-01970
| FIRE-Final Inspection | 11/19/2008 | 11/19/2008 | 11/19/2008 2:11:09 PM | A | PASS |
|
|
Fire life safety finaled, see activity completed 11/13.
|
FIR07-01042
| INSP-Supply line flush | 11/19/2008 | 11/19/2008 | 11/19/2008 2:07:34 PM | A | PART |
|
|
UG FDC piping flush completed acceptable.
|
FIR07-01042
| INSP-Sprinkler Rough-in/Hydro | 11/19/2008 | 11/19/2008 | 11/19/2008 2:06:42 PM | A | PART |
|
|
Standpipe and remote FDC piping hydrostatic testing completed satisfactory.
|
FIR08-00608
| INSP-Final Inspection | 11/18/2008 | 11/19/2008 | 11/19/2008 1:52:14 PM | P | FAIL |
|
|
Three more additional devices need to be added. one in the walkin beer cooler that is open to the public, one in the deli due to wall blocking visual site of device and one in the wash area of pizza kitchen. Testing will need to be performed early am per store manager. KR
|