ELE09-02259
| Conference | 11/19/2009 | 11/19/2009 | 11/19/2009 3:54:04 PM | P | DONE |
|
|
jason Phone #: ###-####
|
ELE08-02758
| Electrical Rough-In | 11/19/2009 | 11/19/2009 | 11/19/2009 2:43:43 PM | P | CANC |
|
|
Christopher Phone #: ###-####. Partial final so that they could install appliances.
|
ELE08-02758
| Final | 11/19/2009 | 11/19/2009 | 11/19/2009 2:42:54 PM | P | PART |
|
|
Christopher Phone #: ###-####. Checked both laundry(stacked units) receptacles, behind zero air refrigerator receptacle, and notified to hard wire double oven.
|
ELE09-02181
| Electrical Rough-In | 11/19/2009 | 11/19/2009 | 11/19/2009 1:45:24 PM | P | PASS |
|
|
Mark Phone #: ###-####. Ok to cover. Notified contractor that he needs to add 3 rooms to his permit.
|
ELE09-02206
| Final | 11/13/2009 | 11/19/2009 | 11/19/2009 12:10:14 PM | A | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Randy Fletcher
|
ELE09-02206
| Conference | 11/19/2009 | 11/19/2009 | 11/19/2009 12:10:05 PM | P | DONE |
|
|
Phone #: ###-#### Internet Inspection Request from: Randy Fletcher. To many violations to list. Spoke to Randy and notied him of the code areas in error. (grounding, phase taping, straping, bonding, ect...)
|
ELE09-02189
| Final | 11/18/2009 | 11/19/2009 | 11/19/2009 11:06:09 AM | A | PASS |
|
|
Please inspect water heater hook up. circuit was already there. thanks Phone #: ###-#### Internet Inspection Request from: ERIC CENTERS
|
ELE09-01237
| Electrical Rough-In | 11/18/2009 | 11/19/2009 | 11/19/2009 11:05:06 AM | A | PART |
|
|
Nathan please if possible late morning as he works nights Phone #: ###-####. Exterior walls. Notified Nathan to increase rooms, and add sevice to permit. Told him that he has to have the reast of rough i n finished before we come back.
|