ESC07-01469
| Aging Inspection | 11/19/2009 | 11/19/2009 | 11/20/2009 3:50:19 PM | | PASS |
|
|
no activity
|
ESC07-01467
| Aging Inspection | 11/19/2009 | 11/19/2009 | 11/20/2009 3:28:46 PM | | DONE |
|
|
|
ESC09-00669
| Tracking Control | 11/19/2009 | 11/19/2009 | 11/19/2009 4:08:01 PM | P | FAIL |
|
|
Verbal to RP: Clean up all hard surface of all sediment and debris. Will re-inspect on 11/23/09Am
|
ESC09-00597
| BMP Violation | 11/19/2009 | 11/19/2009 | 11/19/2009 4:05:26 PM | P | FAIL |
|
|
Verbal message to RP: 1. Clean up all hard sufrace of sediment and debris. 2. Relocate orter pottie of of sidewalk onto the lot. 3. Clean up all concrete washout and residual that is at the front of lot and on the gutterpan. Will re-inspect on 11/23/09am.
|
ESC09-00661
| Tracking Control | 11/17/2009 | 11/19/2009 | 11/19/2009 4:02:06 PM | P | FAIL |
|
|
Verbal correction notice: Clean up all sediement and debris off of all hard surfaces. Provide a trash container and place all trash debris that is not wood inside or remove from site. Will re-inspect on 11/23/09 AM.
|
ESC09-00715
| Site Preparation ESC | 11/19/2009 | 11/19/2009 | 11/19/2009 2:07:38 PM | | PART |
|
|
Verbal to RP: Post ESC sign where visable from 31st street.
|
ESC09-00714
| Site Preparation | 11/19/2009 | 11/19/2009 | 11/19/2009 1:54:15 PM | | CANC |
|
|
Will re-inspect on 11/23/09
|
ESC09-00719
| Site Preparation ESC | 11/19/2009 | 11/19/2009 | 11/19/2009 1:38:26 PM | | NR |
|
|
Will be contacted by the RP with a start date.
|
ESC09-00086
| BMP Violation | 11/17/2009 | 11/19/2009 | 11/19/2009 1:32:16 PM | A | PART |
|
|
Asked RP to have the landscape crew clean up after completed by the end of the day on a daily basis.
|
ESC09-00702
| Site Preparation ESC | 11/19/2009 | 11/19/2009 | 11/19/2009 1:12:48 PM | | PASS |
|
|
|
ESC09-00701
| Site Preparation ESC | 11/19/2009 | 11/19/2009 | 11/19/2009 1:12:39 PM | | PASS |
|
|
|
ESC09-00554
| General Inspection | 11/19/2009 | 11/19/2009 | 11/19/2009 1:12:13 PM | A | FAIL |
|
|
Verbal to GC and RP: 1. Contact city over the RP change. 2. Maintain storm drain at the nirth end of building. Will re-inspect on 11/20/09 PM
|
ESC09-00203
| Conference | 11/17/2009 | 11/19/2009 | 11/19/2009 11:21:18 AM | A | DONE |
|
|
Discussed over tracking issues and concerns. Recommended option that they could pursue to achieve the maximum extent practicalbe. Will follow up randomly next week.
|