Inspections for the day of: Friday, November 19, 2010.
Number of inspections: 10
Percentage of inspections complete: 90 %
Percentage of inspections not complete: 10 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR10-00555 INSP-Final Inspection11/17/201011/18/2010 A 
This inspection will be in the fab. Contact Dan Tuskey at ###-#### for access. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
FIR09-00072 INSP-Final Inspection11/19/201011/19/201011/22/2010 5:36:00 PMPPASS
Fire alarm permit work passed site inspection. Final okayed.
FIR10-00458 INSP-Sprinkler Rough-in11/19/201011/19/201011/22/2010 5:33:29 PMPPART
Overhead work approved for cover at the laundry and office rooms. Conference room rough-in and final okay.
BLD10-01139 FIRE-Final Inspection11/19/201011/19/201011/22/2010 5:28:36 PMPPASS
Fire life safety passed 11/19.
FIR10-00544 INSP-Final Inspection11/19/201011/19/201011/22/2010 11:06:09 AMPPASS
Correction items finished, inspection passed. Fire alarm permit finaled.
FIR09-00268 INSP-Final Inspection11/17/201011/19/201011/22/2010 11:04:47 AMAPASS
Fire alarm testing completed acceptable, inspection passed. Permit finaled.
FIR10-00565 INSP-Final Inspection11/18/201011/19/201011/19/2010 1:00:28 PMPNR
Hood suppression system must report to the fire alarm panel. Fire alarm permit application and drawings have yet to be recieved, reviewed or issued at this time.
FIR09-00473 INSP-Final Inspection11/18/201011/19/201011/19/2010 11:58:25 AMAPASS
Both rough-in and final inspections completed. Inspection passed, permit final approved.
BLD10-02423 FIRE-Final Inspection11/18/201011/19/201011/19/2010 11:56:12 AMANR
Final pending project related fire sprinkler permit resubmitals. Also noted missing doors and hardware at some locations, ceiling tile, etc. Not ready for fire life safety final approvals at this time.
BLD09-00857 FIRE-Final Inspection11/19/201011/19/201011/19/2010 12:00:00 AMPPASS
Fire life safety finaled. Note- door hardware approved per Building Official J. Blais. Refer to architects letter on file.