Inspections for the day of: Tuesday, November 19, 2013.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00569 INSP-Supply line flush11/19/201311/19/201311/19/2013 3:52:49 PMPPASS
Underground flush passed. Also the overhead rough-in passed. Will need another rough-in inspection when the drops have been cut.
FIR13-00439 INSP-Final Inspection11/19/201311/19/201311/19/2013 3:48:29 PMPPASS
Permit finaled. Underground flush passed
BLD13-02401 FIRE-Final Inspection11/18/201311/19/201311/19/2013 3:06:42 PMACANC
Not ready for inspection. Rescheduled for tomorrow.
BLD13-00943 FIRE-Final Inspection11/18/201311/19/201311/19/2013 3:05:52 PMACANC
Not ready for inspection. Rescheduled for tomorrow
FIR13-00383 INSP-Final Inspection11/19/201311/19/201311/19/2013 2:29:35 PMPFAIL
Not ready for a final inspection yet. However all sprinkler piping in the HC Company tenant space can be covered (rough-in passed). Overhead hydro test passed.
FIR13-00497 INSP-Final Inspection11/18/201311/19/201311/19/2013 2:28:15 PMPCANC
Don Phone #: ###-####
FIR13-00497 INSP-Sprinkler Rough-in/Hydro11/18/201311/19/201311/19/2013 2:27:44 PMAPASS
Overhead hydro test passed.
FIR13-00573 INSP-Final Inspection11/18/201311/19/201311/19/2013 2:24:48 PMPFAIL
Started the test but encountered dialer problems with line #2. Test stopped.
FIR13-00396 INSP-Final Inspection11/18/201311/19/201311/19/2013 2:24:03 PMPFAIL
Started the test but encountered dialer problems specifically with line #2. Test stopped.
FIR13-00290 INSP-Final Inspection11/18/201311/19/201311/19/2013 11:07:51 AMPPASS
Permit finaled
FIR13-00290 INSP-Sprinkler Rough-in/Hydro11/18/201311/19/201311/19/2013 10:52:41 AMAPASS
cover & hydro // Don Phone #: ###-####
FIR13-00637 INSP-Final Inspection11/18/201311/19/201311/19/2013 10:33:35 AMAPASS
permit finaled