FIR13-00461
| INSP-Sprinkler Rough-in/Hydro | 11/17/2014 | 11/18/2014 | | A | |
|
|
Inspect fire sprinkler heat trace in basement. Call Jon Novak. Phone #: ###-#### >> Inspection requested via web by Tom Betty
|
FIR14-00797
| INSP-Sprinkler Rough-in | 11/19/2014 | 11/19/2014 | 11/19/2014 2:24:48 PM | P | PART |
|
|
Fire sprinkler modifications at the tenant remodel area okayed for ceiling cover.
|
BLD14-02791
| FIRE-Final Inspection | 11/18/2014 | 11/19/2014 | 11/19/2014 11:34:57 AM | A | PASS |
|
|
Verified corrections. Fire life safety passed. Remainder of project finishes to be completed prior to structural final approval.
|
FIR14-00782
| INSP-Final Inspection | 11/19/2014 | 11/19/2014 | 11/19/2014 11:33:18 AM | A | PASS |
|
|
Fire sprinkler work passed final walkthrough and inspection. Permit finaled.
|
FIR14-00261
| INSP-Conference | 11/18/2014 | 11/19/2014 | 11/19/2014 10:46:30 AM | A | DONE |
|
|
On site conference with general contractor regarding NFPA 13R 6.4.6.3.2.1, (2.2),(2.3) and table 6.4.6.3.4.2
|