ESC15-00726
| Random Inspection | 11/19/2015 | 11/19/2015 | 11/19/2015 4:24:02 PM | P | PASS |
|
|
Project near completion. Some interior work and exterior painting is ongoing and some materials on site. No corrections, need to check for DI bag installed in the MS4s around the project.
|
ESC15-01287
| Site Preparation | 11/19/2015 | 11/19/2015 | 11/19/2015 4:08:04 PM | A | CANC |
|
|
rescheduled for 11/20 AM. Discussed project with RP-GC . Approved for initial excavation today
|
ESC15-01432
| Site Preparation | 11/19/2015 | 11/19/2015 | 11/19/2015 3:27:31 PM | P | PASS |
|
|
Clint Phone #: ###-####
Permit sign posted. BMPs installed in DHE#12 for Tahoe. Approved for excavation.
|
ESC15-00251
| Site Preparation | 11/19/2015 | 11/19/2015 | 11/19/2015 3:27:12 PM | P | PASS |
|
|
Clint Phone #: ###-####
Permit sign posted. BMPs installed in DHE#12 for Tahoe. Approved for excavation.
|
ESC13-00524
| General Inspection | 11/19/2015 | 11/19/2015 | 11/19/2015 2:06:52 PM | | PASS |
|
|
No erosion or sediment runoff occuring on Hackberry Ranch slopes. Streets, sidewalks and gutters are free of loose dirt and trackout. Only 1 active SFH in progress. Site monitoring or revegetation and SFH construction will continue. Discussed hillsides and seeding applications with project owner Scott Kimball on site.
No corrections at this time.
|
ESC15-00696
| Aging Inspection | 11/19/2015 | 11/19/2015 | 11/19/2015 1:17:39 PM | | PASS |
|
|
Work complete. All permits finaled. No loose sediment or other materials on site or leaving site.
|
ESC15-00696
| DOC - Permit Finaled | 11/19/2015 | 11/19/2015 | 11/19/2015 1:16:38 PM | P | PASS |
|
|
|
ESC15-00605
| General Inspection | 11/19/2015 | 11/19/2015 | 11/19/2015 1:00:36 PM | | PASS |
|
|
Retaining wall project complete. No ESC issues or corrections needed. Homeowner RP. Permit closed.
|
ESC15-00605
| DOC - Permit Finaled | 11/19/2015 | 11/19/2015 | 11/19/2015 1:00:06 PM | P | PASS |
|
|
|
ESC12-00130
| General Inspection | 11/19/2015 | 11/19/2015 | 11/19/2015 12:10:02 PM | | PASS |
|
|
Construction complete. Students now occupying aparments. OK for 2x temp DI bags on Royal to stay installed due to the unpaved/undeveloped parking area and section of Royal street which will be improved this spring. No other outstandig issues and bags have remaing capacity.
Site cleaned and stabilized. No further ESC inspections needed.
|
ESC12-00130
| DOC - Permit Finaled | 11/19/2015 | 11/19/2015 | 11/19/2015 12:06:58 PM | P | PASS |
|
|
|
ESC14-00989
| General Inspection | 11/19/2015 | 11/19/2015 | 11/19/2015 11:28:49 AM | | PASS |
|
|
WIP on Harris Ranch commercial multi-use building. Limited activity, site is very well kept and surrounded by curbing and security fence. No trackout, road mix base has been laid down so no muddy areas or trackout.
No corrections.
|
ESC15-00023
| Complaint Inspection | 11/18/2015 | 11/19/2015 | 11/19/2015 11:07:28 AM | A | FAIL |
|
|
Sloppy landscaping and sod operation. Need to clean roadway ASAP.
Noted that previously issued fine is not paid. Need to install a gravel bag to trap some of the mud. Mud everywhere on sidewalk, gutter, and street. ACHD reported it has been this way all week...
Awaiting response from Stetson Homes.
|
ESC14-00588
| Tracking Control | 11/18/2015 | 11/19/2015 | 11/19/2015 10:42:18 AM | A | PEND |
|
|
Substantial rock construction entrance and rumble bars are installed but there is still some degree of trackout occuring.
ESI in process of ordering more rock for round about and parking in front of job trailer.
Sediment check dams installed in new shallow DIs to swale along Parkcenter. Treating runoff but requested installation of filter fabric under rock bags to trap more fines.
Will check back on conditions next week but trackout controls are as prescribed but need further improvement and increased broom sweeping on the paved apron.
|
ESC15-00606
| General Inspection | 11/19/2015 | 11/19/2015 | 11/19/2015 10:06:54 AM | | PASS |
|
|
WIP on commercial building, exisiting parking lot was not disturbed and project with existing sidwalks and curbing. No spills or discharges from staging area. No corrections needed.
|
ESC15-00754
| Site Final | 11/19/2015 | 11/19/2015 | 11/19/2015 10:01:26 AM | P | PASS |
|
|
Aberdeen Square carports complete. Site cleaned and landscaped.
See ESC13-00655 for main permit
|
ESC15-00164
| Site Final | 11/19/2015 | 11/19/2015 | 11/19/2015 9:58:33 AM | P | PASS |
|
|
Aberdeen Square 4-plex complete and occupied. Site cleaned and landscaped.
See ESC13-00655 for main permit
|
ESC13-00655
| Site Final | 11/19/2015 | 11/19/2015 | 11/19/2015 9:54:46 AM | A | NR |
|
|
All ESC conditions satisfied except:
- temporary BMP removal once construction is complete and disturbed area stabilized.
VM left with Jeremy @ Biltmore Company
|
ESC15-00610
| General Inspection | 11/19/2015 | 11/19/2015 | 11/19/2015 9:45:40 AM | | PASS |
|
|
Parking lot re-grading, paving, and stormwater management improvements is complete. No disturbed area on parcel. ESC permit conditions satisfied.
|
ESC15-00610
| DOC - Permit Finaled | 11/19/2015 | 11/19/2015 | 11/19/2015 9:44:01 AM | P | PASS |
|
|
|
ESC15-00507
| Aging Inspection | 11/19/2015 | 11/19/2015 | 11/19/2015 8:47:54 AM | | PASS |
|
|
Home complete and occupied. No sediment runoff issues. ESC conditions satisified.
|
ESC15-00507
| DOC - Permit Finaled | 11/19/2015 | 11/19/2015 | 11/19/2015 8:47:18 AM | P | PASS |
|
|
|