PLM95-01303
| INSP - Sprinkler & Backflow | 11/2/1995 | 11/2/1995 | 11/2/1995 12:00:00 AM | | FAIL |
|
|
|
PLM95-01558
| INSP - Sewer line | 11/2/1995 | 11/2/1995 | 11/2/1995 12:00:00 AM | | FAIL |
|
|
|
PLM95-01558
| INSP - Water lines | 11/2/1995 | 11/2/1995 | 11/2/1995 12:00:00 AM | | PASS |
|
|
/ / 323 - correction needed--replace pvc sewer pipe with abs or sch 40 sewer pipe six feet beyond the water trench.
|
PLM95-01565
| INSP - Water lines | 11/2/1995 | 11/2/1995 | 11/2/1995 12:00:00 AM | P | PASS |
|
|
11/02/95 323 - water line final
|
PLM95-00085
| INSP - Sewer line | 11/2/1995 | 11/2/1995 | 11/2/1995 12:00:00 AM | P | PASS |
|
|
11/02/95 323 - sewer line ok
|
PLM95-00915
| INSP - Final | 11/2/1995 | 11/2/1995 | 11/2/1995 12:00:00 AM | P | PASS |
|
|
11/02/95 323 - final ok
|