MEC98-03463
| INSP - Framing/ Rough-in | 11/2/1998 | 11/2/1998 | 11/2/1998 12:00:00 AM | A | PASS |
|
|
re gas test.
|
BLD98-00844
| INSP - Final | 10/29/1998 | 11/2/1998 | 11/2/1998 12:00:00 AM | A | PASS |
|
|
LC#17408,
|
BLD98-01292
| INSP - Final | 10/30/1998 | 11/2/1998 | 11/2/1998 12:00:00 AM | A | FAIL |
|
|
need ok by zoning hill side requirements.
|
BLD98-02052
| INSP - Energy code compliance | 10/31/1998 | 11/2/1998 | 11/2/1998 12:00:00 AM | A | PASS |
|
|
Scheduled by Hello!. Contact phone is [8666175].
|
BLD98-02052
| INSP - Framing/Rough-in | 11/2/1998 | 11/2/1998 | 11/2/1998 12:00:00 AM | A | PART |
|
|
still has correction at the stairs.
|
BLD98-02425
| INSP - Framing/Rough-in | 10/30/1998 | 11/2/1998 | 11/2/1998 12:00:00 AM | A | FAIL |
|
|
left corrections.o!. Contact phone is [8635808].
|
BLD98-03006
| INSP - Foundation | 11/2/1998 | 11/2/1998 | 11/2/1998 12:00:00 AM | A | PART |
|
|
Owner has dug out under the slab,to obtain frost depth for the addition which was built with out permits,this is to help correct the problem,now the addition will have concrete below frost depth at the perimeter under existing slab,still need to add the same behind the a/c unit,he has told me this will be done and inspected to verify at a second pour.Note slab to footing will have a cold joint,as built with out permits and the footing added is to hep correct the problem, A permit should have been obtained first and footings should have been to frost depth to start with.
|
BLD98-02711
| INSP - Energy code compliance | 10/30/1998 | 11/2/1998 | 11/2/1998 12:00:00 AM | P | PASS |
|
|
GEORGE- ###-#### CELL ENERGY CODE INSP
|
BLD98-02711
| INSP - Framing/Rough-in | 11/2/1998 | 11/2/1998 | 11/2/1998 12:00:00 AM | P | PART |
|
|
still has minor correction will call for re-insp.
|
BLD98-02371
| INSP - Framing/Rough-in | 10/30/1998 | 11/2/1998 | 11/2/1998 12:00:00 AM | P | FAIL |
|
|
left corrections.
|
MEC98-03636
| INSP - Framing/ Rough-in | 11/2/1998 | 11/2/1998 | 11/2/1998 12:00:00 AM | P | FAIL |
|
|
|
MEC98-03654
| INSP - Framing/ Rough-in | 11/2/1998 | 11/2/1998 | 11/2/1998 12:00:00 AM | P | FAIL |
|
|
An inspection for 2 zero clearace fire places was called for and they have been sheetrocked,now i am unable to inspect piping,left notices on both units.
|
BLD98-00777
| INSP - Framing/Rough-in | 11/2/1998 | 11/2/1998 | 11/2/1998 12:00:00 AM | P | PART |
|
|
noted to contractor man door at zamboni room does not have correct rating.
|