Inspections for the day of: Tuesday, November 2, 1999.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-03078 BLD-Footing11/1/199911/2/199911/2/1999 12:00:00 AMAPART
rob--- ###-#### ft insp Ft. appears ok
BLD99-03158 BLD-Footing11/1/199911/2/199911/2/1999 12:00:00 AMAPART
rob--- ###-#### ft insp Ft. appears ok
BLD99-03067 BLD-Footing11/1/199911/2/199911/2/1999 12:00:00 AMAPART
BOB ###-#### Ft. appears ok
BLD99-03223 BLD-Footing11/1/199911/2/199911/2/1999 12:00:00 AMAPART
kris ###-#### ft insp Ft. appears ok
BLD99-03210 BLD-Footing11/1/199911/2/199911/2/1999 12:00:00 AMAPART
DANE ###-#### Ft. appears ok
BLD99-01893 BLD-Final11/1/199911/2/199911/2/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/01/1999 at 16:24:08. Contact: ###-####. C/C #16285
BLD99-02741 BLD-Framing/Rough-in11/1/199911/2/199911/2/1999 12:00:00 AMPPART
REINSPECT ON SHEAR NAIL BRYAN ###-#### Shear wall ok
BLD99-03005 BLD-Framing/Rough-in11/2/199911/2/199911/2/1999 12:00:00 AMPFAIL
rod ###-#### shear wall insp C/N.. Provide eng. Calcs. To check shear nailing.
BLD99-01945 BLD-Framing/Rough-in11/2/199911/2/199911/2/1999 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 11/02/1999 at 08:40:15. Contact: ###-####. C/N.. Fireblocks, straps.
BLD98-03667 BLD-Final11/2/199911/2/199911/2/1999 12:00:00 AMPPART
ROGER--- ###-#### FN OCC INSP C/N need req. signatures and obstain perm. Occ. Status within 90 days of this notice.
BLD99-02429 BLD-Framing/Rough-in11/2/199911/2/199911/2/1999 12:00:00 AMPFAIL
SHANE--- ###-#### FR INSP C/N need header @ bearing wall living room (alcove)
BLD99-02390 BLD-Conference11/2/199911/2/199911/2/1999 12:00:00 AMPPASS
TONY ###-#### Framing consultation