ELE01-02641
| ELE-Aging Inspection | 11/2/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | | PASS |
|
|
sign looks ok no access to soffit 11/9/2001 3:39:06 PM
|
ELE01-02986
| Final | 11/1/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | A | FAIL |
|
|
correction called 310-15 table310-15(b) (2) (a) needs to derate wires in emt 11/2/2001 2:49:34 PM
|
ELE01-02989
| Final | 11/1/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | A | FAIL |
|
|
###-#### called contractor correction 310-15 deration of conductors in a raceway 11/2/2001 5:53:59 PM
|
ELE01-02992
| Final | 11/1/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | A | FAIL |
|
|
called contractor correction 310-15 deration of conductors in a raceway 11/2/2001 5:53:00 PM
|
ELE01-03640
| Rough-In Permanent Service | 11/1/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/01/2001 at 15:37:29. Contact: ###-####. cor. and fee due posted called 300-4 1 1/4 11/2/2001 10:33:00 AM
|
ELE01-03124
| Electrical Rough-In | 11/1/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 11/01/2001 at 22:54:41. Contact: ###-####. partial one room ok the other owner has some work to do still see JF for details 11/2/2001 11:48:44 AM
|
ELE01-03697
| Rough-In Permanent Service | 10/29/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | A | FAIL |
|
|
###-#### STEVE cor. and fee due posted called 370-16 , and 300-4 1 1/4, nail plates 11/2/2001 10:32:18 AM
|
ELE01-03699
| Electrical Rough-In | 10/29/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | A | FAIL |
|
|
STEVE ###-#### ffe due , do not cover ,a nd correction posted called 300-4 1 1/4 inches 11/2/2001 2:45:23 PM
|
ELE01-02986
| Electrical Rough-In | 11/2/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 315 On 11/2/2001 11:56:27 AM conference ok
|
ELE01-02639
| Electrical Rough-In | 11/2/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 315 On 11/2/2001 4:43:11 PM concrete cover for electrode ok
|
ELE01-03116
| Final | 11/2/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | P | FAIL |
|
|
cor. posted 70-20 needs box extension, 336-6(b) protect romex in peninsular counter, 410-8 fixture shall be mounted 6ft above storage space as defined by 410-8(a) definitions did not call no call back # given 11/2/2001 3:33:35 PM
|
ELE01-03721
| Final | 11/2/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | P | FAIL |
|
|
###-#### JEAN cor. posted called remove bond screw at sub panel, and 110-26 remove phone cable from below p/s and from above sub panel in basement 11/2/2001 5:10:52 PM
|
ELE01-03138
| Final | 11/2/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | P | PASS |
|
|
###-#### PATRICK ok 11/2/2001 4:41:39 PM
|
ELE01-02639
| Final | 11/2/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | P | CANC |
|
|
###-#### PATRICK no final r/i for concrete encased electrode 11/2/2001 4:42:31 PM
|
ELE01-02254
| Final | 11/2/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | P | PASS |
|
|
###-#### PATRICK ok 11/2/2001 4:41:25 PM
|
ELE01-03695
| Electrical Rough-In | 11/2/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | P | FAIL |
|
|
###-#### MARTIN do not cover , correction, and $42.00 fee due posted called 300-4 nail plates and 1 1/4, and 336-18 shall not staple cables on edge 11/2/2001 2:06:38 PM
|
ELE01-03130
| Final | 11/2/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/02/2001 at 10:01:00. Contact: ###-####. ok 11/2/2001 3:58:34 PM
|
ELE01-01772
| Electrical Rough-In | 11/1/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/01/2001 at 12:01:26. Contact: ###-####. u/g for parking lot ok 11/2/2001 4:44:42 PM
|
ELE01-01772
| Electrical Rough-In | 11/1/2001 | 11/2/2001 | 11/1/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 11/01/2001 at 11:48:24. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 11/01/2001 at 12:00:07.
|