BLD98-02583
| BLD-Conference | 11/1/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | A | PASS |
|
|
###-#### Dave needs arch details for change for stairs 11/1/2001 2:56:31 PM
|
BLD01-02583
| BLD-Framing/Rough-in | 11/1/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-00236
| BLD-Framing/Rough-in | 11/1/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | A | PART |
|
|
mike ###-#### or scott ###-#### -check demissing wall wip dimising wall ok to cover 11/2/2001 10:15:03 AM
|
BLD01-01560
| BLD-Foundation | 11/1/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 11/01/2001 at 13:16:24. Contact: . wip pending report from strata 11/2/2001 10:21:13 AM
|
BLD01-01109
| BLD-Concrete | 11/1/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | A | PART |
|
|
###-#### JAN pending spec insp 11/1/2001 3:32:38 PM
|
BLD01-02756
| BLD-Foundation | 11/1/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | A | PART |
|
|
###-#### ROD northwest wall corner 11/2/2001 11:40:41 AM
|
BLD01-02691
| BLD-Footing | 11/2/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | P | PASS |
|
|
ft insp bill- ###-####
|
BLD01-02793
| BLD-Footing | 11/2/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | P | PASS |
|
|
###-#### gary
|
MIS01-00215
| BLD-Conference | 11/2/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | P | PART |
|
|
Cindy, ###-#### needs to complete fire insp cn 11/2/2001 4:22:26 PM
|
MEC01-03303
| Pressure Test | 11/2/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/02/2001 at 10:28:25. Contact: ###-####.
|
MEC01-03304
| Final | 11/2/2001 | 11/2/2001 | 11/2/2001 12:00:00 AM | P | PASS |
|
|
call for access ###-#### George
|