Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01938 BLD-Framing/Rough-in11/1/200111/2/200111/2/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/01/2001 at 10:55:55. Contact: ###-####.Shear only--not ready for frame-missing mechanical r. i. approval. Ok to side. 11/2/2001 10:36:49 AM
BLD00-03272 BLD-Final11/1/200111/2/200111/2/2001 12:00:00 AMAPASS
###-####
BLD00-03273 BLD-Final11/1/200111/2/200111/2/2001 12:00:00 AMAPASS
###-####
BLD00-03274 BLD-Final11/1/200111/2/200111/2/2001 12:00:00 AMAPASS
###-####
BLD00-03275 BLD-Final11/1/200111/2/200111/2/2001 12:00:00 AMAPASS
###-####
BLD00-03276 BLD-Final11/1/200111/2/200111/2/2001 12:00:00 AMAPASS
###-####
BLD01-02805 BLD-Foundation11/1/200111/2/200111/2/2001 12:00:00 AMAPART
###-#### wip 11/2/2001 12:30:34 PM
BLD01-02663 BLD-Framing/Rough-in11/2/200111/2/200111/2/2001 12:00:00 AMAFAIL
Scheduled by Inspector: 420 On 11/2/2001 9:36:09 AM c/n posted on site--mechanical and air seal package not completed--Roof and crawl needs to be checked at next inspection. Do not insulate. 11/2/2001 9:38:45 AM
BLD01-01167 BLD-Framing/Rough-in11/1/200111/2/200111/2/2001 12:00:00 AMAFAIL
late am ###-#### c/n prior c/n items not completed. Complete all items and re-call. 11/2/2001 11:24:01 AM
BLD01-02528 BLD-Footing11/1/200111/2/200111/2/2001 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 11/01/2001 at 17:38:04. Contact: .
BLD99-01532 BLD-Final11/2/200111/2/200111/2/2001 12:00:00 AMPFAIL
###-#### ROB verbal correction--handrails need to return to wall and outside upper exit landing does not meet code--only 25 " alway from building. 11/2/2001 1:55:59 PM
BLD01-02801 BLD-Foundation11/2/200111/2/200111/2/2001 12:00:00 AMPPASS
concrete scheduled for 3 ###-####
BLD01-02909 BLD-Final11/2/200111/2/200111/2/2001 12:00:00 AMPPASS
fn- scott ###-####
BLD01-01990 BLD-Framing/Rough-in11/2/200111/2/200111/2/2001 12:00:00 AMPFAIL
shear -sheila ###-#### c/n posted on site. SHEAR 11/2/2001 3:11:23 PM
MEC99-02305 Final11/2/200111/2/200111/2/2001 12:00:00 AMPDONE
Scheduled by Inspector: 420 On 11/2/2001 1:38:46 PM
BLD01-02489 BLD-Framing/Rough-in11/1/200111/2/200111/2/2001 12:00:00 AMPFAIL
###-#### c/n posted on site -- do not side 11/2/2001 1:11:37 PM