BLD05-00128
| BLD-Foundation | 11/2/2005 | 11/2/2005 | 11/2/2005 12:00:00 AM | P | PART |
|
|
Met with structural engineer and reviewed foundation wall reinforcement on southwest corner of building, concrete placement scheduled for 11/03/05. Requested a entire stamped engineering package when concrete work was completed as design requirements had changed. Craig said he would provide.
|