ELE05-02806
| Final | 11/2/2005 | 11/2/2005 | 11/2/2005 4:04:30 PM | P | PART |
|
|
Late afternoon inspection if possible. Thanks.; Phone #: ###-#### Internet Inspection Request from: Ryan Christensen left corr notice,250 bond hot and cold water pipe,210.8 add gfci within 25' of rooftop unit, 408.4 add panel schedules, 210.8 gfci by sink 400.8 lite shall not be cord connected
|
ELE05-03971
| Temporary Service | 11/2/2005 | 11/2/2005 | 11/2/2005 3:58:41 PM | P | PASS |
|
|
###-#### darrell t/s u/g n ok
|
ELE05-03086
| Final | 11/2/2005 | 11/2/2005 | 11/2/2005 3:19:29 PM | P | PASS |
|
|
mike ###-#### ok to final
|
ELE05-03250
| Final | 11/2/2005 | 11/2/2005 | 11/2/2005 1:51:38 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/2/2005 at 7:53:18 AM. Contact: ###-####. left survey with elect,408.4 ckt directory shall be correct, 352.30(A) rnc shall be strapped, 314.21 recpt covers shall not have gaps, 406.4(D) recpt faceplates shall be flush with rcpt, 422.16(B) cords shall be 18" to 36" if using disposals. Will check on next final. Signed occ card
|
ELE05-03773
| Electrical Rough-In | 11/1/2005 | 11/2/2005 | 11/2/2005 9:41:46 AM | A | NR |
|
|
kendall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles no fa prints, so no piping done for same. elect ri ok. They will recall. Left corr notice,210.62 shall add show room rcpts over windows
|
ELE05-03702
| Electrical Rough-In | 11/2/2005 | 11/2/2005 | 11/2/2005 12:00:00 AM | A | PASS |
|
|
ok to cover fibre-optic dome soffit,left corr notice 210.62 show window recpts shall be installed directly over windows and for every 12'
|
ELE05-03780
| Electrical Rough-In | 11/2/2005 | 11/2/2005 | 11/2/2005 12:00:00 AM | A | PART |
|
|
left corr notice, 210.62 show room window recpt shall be added
|