Inspections for the day of: Thursday, November 2, 2006.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE06-03413 Final11/1/200611/2/200611/2/2006 4:45:11 PMPPASS
PAUL; Phone #: ###-#### Internet Inspection Request from: Sean DeLacy corr made, ok to final
ELE06-04037 Electrical Rough-In11/2/200611/2/200611/2/2006 3:35:45 PMPPASS
dennis ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ric ok
ELE06-04047 Electrical Rough-In11/2/200611/2/200611/2/2006 3:18:58 PMPFAIL
trent ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith called, left corr notice, 300.4(A) & (D) nec edge of bored holes and mc cable shall be 1 1/4" from edge of framing member
ELE06-02755 Final11/2/200611/2/200611/2/2006 2:32:05 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Dan Rohl ok to final
ELE06-02975 Final11/2/200611/2/200611/2/2006 1:54:35 PMPPASS
final inpect for main walk area and sales desk, bathrooms and arcade area.; Phone #: ###-#### Internet Inspection Request from: todd hall ok to final
ELE06-03780 Electrical Rough-In11/2/200611/2/200611/2/2006 12:59:03 PMPFAIL
jack - underground ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith called, left message, left corr notice, nec 352.26 there shall not be over 360 degree total bend in rnc without pull points, 680.10 & 300.5 minimum burial depth shall be 18" for u/g conduit, BCC shall inspect all u/g before cover
ELE06-04073 Conference11/1/200611/2/200611/2/2006 10:49:24 AMADONE
WOrk performed by Aaron White.; Phone #: ###-#### Internet Inspection Request from: Matt Santacruz met and reviewed service and sub-panel, try to determine if owner did re-work of sub-panel, told owner he had to get elect permit to do any work, told not to call for service change until violations were fixed
ELE06-00856 Final11/1/200611/2/200611/2/2006 10:32:36 AMAPASS
sean ; Phone #: ###-#### - notes: various gates - Internet Inspection Request from: Patricia Smith per 315 all u/g ok, equip listed and installed ok, ok to final
ELE06-04061 Final11/1/200611/2/200611/2/2006 10:28:31 AMAPASS
allen ###-#### for hot tub ok to final
ELE06-03551 Final11/1/200611/2/200611/2/2006 9:31:33 AMAPASS
jason; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to final
ELE06-02657 Electrical Rough-In11/1/200611/2/200611/2/2006 8:42:24 AMAPART
lauren ; Phone #: ###-#### - note: as early as possible - Internet Inspection Request from: Patricia Smith lobby and office plus borders ok to cover
ELE06-04069 Electrical Rough-In11/1/200611/2/200611/2/2006 8:18:41 AMAPASS
Doug Moyle ###-#### ric walls only ok