Inspections for the day of: Thursday, November 2, 2006.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00690 INSP-Conference10/31/200611/2/200611/3/2006 9:00:34 AMADEFR
Phone #: ###-#### Internet Inspection Request from: Ken Campbell
FIR06-00545 INSP-Final Inspection10/31/200611/2/200611/3/2006 9:00:18 AMADEFR
Phone #: ###-#### Internet Inspection Request from: Rob Puckett
BLD05-03105 FIRE-Final Inspection11/1/200611/2/200611/3/2006 8:59:22 AMPCANC
Life safety final pending project related FIR permit finals.
FIR06-00795 INSP-Final Inspection11/2/200611/2/200611/2/2006 4:29:01 PMPNR
The shell fire alarm permit must be approved and finaled prior to inspection and final of this TI permit.
FIR06-00794 INSP-Final Inspection11/2/200611/2/200611/2/2006 4:28:06 PMPNR
The shell fire alarm permit must be approved and finaled prior to inspection and final for this TI permit.
FIR06-00793 INSP-Final Inspection11/2/200611/2/200611/2/2006 4:27:04 PMPNR
The shell fire alarm permit must be approved and finaled prior to inspection and approval of this TI permit.
BLD06-01534 FIRE-Final Inspection11/2/200611/2/200611/2/2006 4:25:48 PMPPASS
Life safety passed field inspection.
FIR06-00662 INSP-Sprinkler Rough-in11/2/200611/2/200611/2/2006 4:16:05 PMPPART
UG fire supply line is okay to cover, contractor to backfill the annular space between the ductile riser pc. and the concrete stem wall/floor slab with approved material.
FIR06-00712 INSP-Final Inspection11/1/200611/2/200611/2/2006 2:31:24 PMANR
Final pending shell permit completion.
FIR06-00695 INSP-Final Inspection11/1/200611/2/200611/2/2006 2:30:54 PMANR
Final pending shell permit completion.
FIR06-00694 INSP-Final Inspection11/1/200611/2/200611/2/2006 2:30:29 PMANR
Final pending shell permit completion.
FIR06-00375 INSP-Final Inspection11/1/200611/2/200611/2/2006 2:29:19 PMADEFR
Pending unfinished alarm work.
FIR06-00507 INSP-Final Inspection11/1/200611/2/200611/2/2006 2:27:24 PMANR
Per contractor the elevator shaft smoke and heat detectors are not yet installed.
BLD05-03105 FIRE-Final Inspection11/2/200611/2/200611/2/2006 2:26:06 PMPCANC
Duplicate inspection request already called in.
FIR06-00691 INSP-Final Inspection11/2/200611/2/200611/2/2006 2:05:07 PMPCANC
No time available for inspection today, to be rescheduled per agreement with contractor.
FIR06-00589 INSP-Final Inspection11/1/200611/2/200611/2/2006 2:01:27 PMPCANC
No time to complete this inspection today, to be rescheduled per agreement with contractor.
FIR06-00810 INSP-Final Inspection11/2/200611/2/200611/2/2006 1:58:48 PMPCANC
No time available to complete this inspection request today, to be rescheduled per conversation with contractor.
FIR05-00402 INSP-Sprinkler Rough-in/Hydro11/1/200611/2/200611/2/2006 1:55:15 PMPCANC
No time to complete this inspection.
FIR05-00861 FIR-Aging Inspection11/2/200611/2/200611/2/2006 1:53:19 PM PASS
Work has been completed, no request for demo inspection was made.
FIR06-00502 INSP-Final Inspection11/2/200611/2/200611/2/2006 1:14:47 PMPPASS
Fire alarm permit finaled.
FIR06-00502 INSP-Final Inspection11/2/200611/2/200611/2/2006 1:13:04 PMAPART
Two of three items on the previous correction notice have been verified for completion including signage at the door to the FACP room and retest of the PIV tamper switch. The latching supervisory signals at the panel have been conditionally accetped for this project only by Boise City PDS department head B. Chatterton. Contractor failed to produce NFPA 72 record of completion forms at final testing, permit final pending correct documentation for acceptance signature.
BLD06-03001 FIRE-Conference11/1/200611/2/200611/2/2006 1:04:07 PMADONE
On site confrence to discuss building modifications which may affect the fire sprinkler system, noted one area outside the new data room which is lacking proper coverage, project will require an FIR permit to complete this work.
BLD06-03000 FIRE-Conference11/1/200611/2/200611/2/2006 1:01:06 PMADONE
On site confrence to discuss building modifications which may affect the fire sprinkler system.
FIR06-00468 INSP-Final Inspection11/2/200611/2/200611/2/2006 12:31:30 PMPFAIL
Several items need addressed, left a 6 item c/n on site including heads installed do not match the type system was designed for or submitted on, the single service supply as indicated has not been witnessed for flush see note #11, need to provide access to inspect the OH installation as no rough-in inspection was requested, there is a non-monitored shutoff valve upstream of the system controls and flow switch see note #13 for requirements, the WH closet needs an intermediate head installed, provide verification of the type of antifreeze used as this system is CPVC. NOTE: the sprinkler monitoring has been connected without a fire alarm permit.