FIR07-00635
| FIR-Aging Inspection | 11/2/2007 | 11/2/2007 | 11/2/2007 6:53:11 PM | | NR |
|
|
work is in progress
|
FIR07-00726
| INSP-Sprinkler Rough-in/Hydro | 11/1/2007 | 11/2/2007 | 11/2/2007 6:51:04 PM | P | PASS |
|
|
Overhead hydro test passed.
|
FIR07-00336
| INSP-Sprinkler Rough-in/Hydro | 11/1/2007 | 11/2/2007 | 11/2/2007 6:50:35 PM | P | CANC |
|
|
Overhead hydro test passed.
|
FIR07-00854
| INSP-Sprinkler Rough-in | 11/1/2007 | 11/2/2007 | 11/2/2007 1:07:38 PM | A | PASS |
|
|
The underground from the inside stubin to 16' out is ok to cover. See the city approved plans for piping.
|
FIR07-00811
| INSP-Sprinkler Rough-in | 11/1/2007 | 11/2/2007 | 11/2/2007 11:21:35 AM | A | PASS |
|
|
Sprinkler rough-in passed. System needs filled with anti-freeze and inspection tag provided.
|