FIR09-00452
| FIR-Aging Inspection | 11/2/2009 | 11/2/2009 | 11/2/2009 4:51:06 PM | | DEFR |
|
|
In progress
|
BLD09-00616
| FIRE-Conference | 11/2/2009 | 11/2/2009 | 11/2/2009 4:50:41 PM | P | DONE |
|
|
On site visit regarding project attatched fire alarm and sprinkler permit work including coverage at the elevator machine room, monitoring for the existing fire sprinkler riser, fire code review notes, location of the new panel, NFPA 13 and 72 requirements.
|
FIR09-00384
| INSP-Sprinkler Rough-in | 11/2/2009 | 11/2/2009 | 11/2/2009 4:46:27 PM | P | PART |
|
|
Inspection for cover at the hard lid ceilings for the first floor passed with the exception of annotated areas including a missing hanger, insulation to be moved, one incompleted branchline serving two rooms, added and deleted heads to be shown on record drawings, exposed wood above partition walls to be sheetrocked or protected with sprinklers, need to schedule inspeciton for insulation fill at concealed pockets.
|
FIR09-00376
| INSP-Sprinkler Rough-in | 11/2/2009 | 11/2/2009 | 11/2/2009 4:41:45 PM | P | PART |
|
|
Okay to cover fire sprinkler modifications at the drop ceiling in the elevator lobby, noted fire caulking to be provided at rated wall penetrations. Coverage at the elevator mechanical room to be in compliance with NFPA13 8.7.6.1 regarding ceiling pockets or provide a drop ceiling as discussed.
|
BLD09-00945
| FIRE-Final Inspection | 11/2/2009 | 11/2/2009 | 11/2/2009 4:35:48 PM | P | PART |
|
|
Fire life safety inspection completed okay for the phase 3 portion of remodel work, some corrections made while on site including removal of covers at existing smoke detectors, directional arrow at one exit sign, escutcheons at some sprinkler heads. Remodel work at adjacent areas in progress.
|
FIR09-00623
| INSP-Final Inspection | 10/30/2009 | 11/2/2009 | 11/2/2009 4:30:56 PM | A | PASS |
|
|
New fire alarm notification devices per the scope of permit work for the portion of remodel indicated passed functional on site test.
|