FIR11-00401
| INSP-Final Inspection | 10/25/2011 | 10/31/2011 | | A | |
|
|
earl - 8:00 am Phone #: ###-####
|
BLD11-02553
| FIRE-Conference | 11/2/2011 | 11/2/2011 | 11/2/2011 5:08:29 PM | P | DONE |
|
|
Regarding details of correction items and specific requirements.
|
BLD11-02392
| FIRE-Conference | 11/2/2011 | 11/2/2011 | 11/2/2011 5:07:14 PM | P | DONE |
|
|
Conversation with contractor regarding components of an existing fire alarm system to be removed including an associated FIR demo permit.
|
FIR11-00552
| INSP-Final Inspection | 11/2/2011 | 11/2/2011 | 11/2/2011 5:03:21 PM | P | PASS |
|
|
Fire sprinkler permit okay for final.
|
BLD11-02518
| FIRE-Final Inspection | 11/1/2011 | 11/2/2011 | 11/2/2011 1:51:56 PM | P | PASS |
|
|
Fire life safety inspection completed satisfactory.
|
FIR11-00519
| INSP-Final Inspection | 11/1/2011 | 11/2/2011 | 11/2/2011 1:51:01 PM | A | PASS |
|
|
Fire alarm testing completed, inspection passed. Record of completion reports and missing SD head at the electrical room to be provided prior to BLD final.
|
FIR11-00583
| INSP-Sprinkler Rough-in | 11/1/2011 | 11/2/2011 | 11/2/2011 1:48:47 PM | A | PART |
|
|
Overhead modifications are okay for cover at the sheetrock ceilings.
|
FIR11-00585
| INSP-Final Inspection | 11/1/2011 | 11/2/2011 | 11/2/2011 1:47:36 PM | A | PASS |
|
|
Fire sprinkler permit final approved.
|
FIR11-00576
| INSP-Final Inspection | 11/1/2011 | 11/2/2011 | 11/2/2011 1:04:58 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Josh Bess Inspection cancelled from web by: Josh Bess
|