BLD15-03302
| BLD-Final | 10/30/2015 | 11/2/2015 | 11/3/2015 8:27:09 AM | P | PEND |
|
|
Please call ahead for access - Carl Phone #: ###-####. open plumbing permit, mounting system does not have a current ES report.
|
BLD15-03223
| BLD-Conference | 11/2/2015 | 11/2/2015 | 11/2/2015 3:16:42 PM | P | PART |
|
|
Tim Phone #: ###-####. The 3,000 s.f. remodel portion is completed. Owner is hiring his own trades to complete the remainderr of the work. Owner will need to call for a final inspection after trades are finaled prior to occupancy.
|
BLD15-03710
| BLD-Final | 11/2/2015 | 11/2/2015 | 11/2/2015 2:43:19 PM | P | PASS |
|
|
Hans Phone #: ###-####. ok for perm occ.
|
BLD15-02730
| BLD-Conference | 11/2/2015 | 11/2/2015 | 11/2/2015 1:53:03 PM | P | NR |
|
|
Mike,
We anticipate having something from the engineer this morning on the rebar. We would still like to pour the walls this afternoon, if possible. With the engineer''s.response, do we still need MTI for rebar inspection? Do we need MTI for cylinders? What is the best email to send your the engineer"s response? Thanks Phone #: ###-#### Inspection requested via web by Clayn Sonderegger. No response from engineer of record for in place work or repair.
|
BLD15-02169
| BLD-Framing/Rough-in | 10/30/2015 | 11/2/2015 | 11/2/2015 1:28:07 PM | P | NR |
|
|
Josh Phone #: ###-####. Mech. and electrical roough in inspection haver failed.
|
BLD15-02951
| BLD-Foundation | 10/30/2015 | 11/2/2015 | 11/2/2015 1:25:29 PM | P | PASS |
|
|
Dean Phone #: ###-####
|
ESC15-00739
| Site Final | 11/2/2015 | 11/2/2015 | 11/2/2015 10:21:05 AM | A | DONE |
|
|
|
ESC15-00739
| DOC - Permit Finaled | 11/2/2015 | 11/2/2015 | 11/2/2015 10:20:49 AM | P | PASS |
|
|
|
BLD15-01972
| BLD-Final | 10/30/2015 | 11/2/2015 | 11/2/2015 10:20:25 AM | A | PASS |
|
|
Sheila-please contact for access code Phone #: ###-####
|
BLD15-01972
| DOC - Permit Finaled | 11/2/2015 | 11/2/2015 | 11/2/2015 10:20:10 AM | P | PASS |
|
|
|
BLD15-01601
| BLD-Wall Bracing | 10/29/2015 | 11/2/2015 | 11/2/2015 9:33:30 AM | A | FAIL |
|
|
Travis Phone #: ###-####.. North and south wall shaer walls ok. Did note however that east and west walls are one construction to to proximity to property lines. Contractor to provide 1hr. construction on east and west walls per approved plan. Provide approved detail from architect showing the paprpet rating as well as soffitt? A correction notice was issued
|