Inspections for the day of: Monday, November 2, 2015.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-01159 General Inspection11/2/201511/2/201511/2/2015 4:31:51 PMPPASS
WIP on homes by CBH in Peppermill Estates. Subdivision is clean, DI bags installed, designated washout in use, and each home has trash containment . Appproved.
ESC15-00070 General Inspection11/2/201511/2/201511/2/2015 4:30:55 PM PASS
ESC13-01323 General Inspection10/29/201511/2/201511/2/2015 4:16:44 PMPPASS
WIP on installing final carports. Need to remove 3 x DI sediment bags on Overland and one on Cloveredale as well as silt fence to get site final. No violations occuring.
ESC14-00892 General Inspection11/2/201511/2/201511/2/2015 3:57:21 PM PASS
Near completion. Final trash and material haul off in progress. No trackout or discharges. Open space for townhome subdivision has been landscaped and stabilized. Will check for site final next week.
ESC15-00467 General Inspection11/2/201511/2/201511/2/2015 3:25:41 PM PEND
Home is now occupied and landscaped.

Two corrections to get site final:
- remove or address stockpile stored on adjacent site.
- clean out washout piles left on adjacent lot

No sediment leaving site, and no materials in sidewalk, gutter, or street...
ESC15-01327 Site Preparation11/2/201511/2/201511/2/2015 2:26:38 PMPPASS
Phone #: ###-#### Inspection requested via web by Weston Wagner


Permit sign posted. Subdivision BMPs installed (DI bags, lined washout pit). Access to be through alleyways which are to be swept regularly to control trackout and mud clods. Approved.
ESC15-01329 Site Preparation11/2/201511/2/201511/2/2015 2:26:15 PMPPASS
Phone #: ###-#### Inspection requested via web by Weston Wagner

Permit sign posted. Subdivision BMPs installed (DI bags, lined washout pit). Access to be through alleyways which are to be swept regularly to control trackout and mud clods. Approved.
ESC15-00667 General Inspection11/2/201511/2/201511/2/2015 2:17:34 PMPPART
Warm Springs by-pass road is now open to vehicles. Shoulders and sidewalk areas have been graded and tracked. Stockpiles of excess dirt have been hauled away. Street has been swept of loose sediment. Drainage is roadside swales.

Graded areas have not yet been hydroseeded/mulched so project area is not yet stabilized per ESC permit conditions.
ESC15-00709 Random Inspection11/2/201511/2/201511/2/2015 1:15:55 PMPPASS
Frame of home is up. WIP. No violations observed.
ESC15-00237 General Inspection11/2/201511/2/201511/2/2015 1:07:48 PM PART
Home exterior is complete. No activity. Site is not yet landscapced and no driveway so it is quite muddy with some recent trackout from single vehicle. Since no work occuring there is no other issues and no complaints received.

Verbal request to use street for parking or install stabilized entrance.
ESC14-00696 General Inspection11/2/201511/2/201511/2/2015 11:48:26 AM PASS
No construction activity at and associated BLD is finaled. Landscaping has been completed along Reserve Street and parking lot has been cleaned. There is a strip of the parcel behind building that is not landscaped or stabilized, but no loose sediment or runoff concerns.

Permit finaled.
ESC14-00696 DOC - Permit Finaled11/2/201511/2/201511/2/2015 11:46:13 AMPPASS
ESC14-00169 Aging Inspection11/2/201511/2/201511/2/2015 11:07:25 AM PASS
Work complete. Industrial site so no landscaping installed, but bare areas are surroundied by curbing. No loose sediment leaving. All permits finaled.
ESC14-00169 DOC - Permit Finaled11/2/201511/2/201511/2/2015 11:05:35 AMPPASS
ESC14-00653 Aging Inspection11/2/201511/2/201511/2/2015 10:44:06 AM PASS
No activity since April 2015 on BLD. No loose sediment or construction materials on site. Yard has patchy grass. No stormwater pollution issues observed. Permit expired/finaled.
ESC14-00653 DOC - Permit Finaled11/2/201511/2/201511/2/2015 10:43:04 AMPPASS
ESC15-00826 Tracking Control11/2/201511/2/201511/2/2015 10:21:41 AMAPART
Trackout and loose sand and sedment onto S. Holden. No storm drains in the area of sheet flow.

Correction request to RP to sweeping up trackout and find better place for sand stockpile. No spills or other issues. Permit sign posted.
ESC13-00471 Aging Inspection11/2/201511/2/201511/2/2015 10:17:39 AM PASS
WIP on final homes in Tianna Park by Sunrise Homes (permitted seperately). No significant trackout. Trash and materials are contained on site, DI bag installed on Spinaker
ESC15-01310 Site Preparation10/28/201511/2/201511/2/2015 9:52:33 AMAPASS
Ken Phone #: ###-####

Met contractor on site. 2 x DI bags installed (Broadway to the north, Linden to the south). Permit sign posted on electrical utility box.

Work area is north of existing Jacksons, tree removal will begin today. Construction entrance and gravel staging area will be installed after tree removal and when equipment is brought on site.

Approved for construction. New store will be built over winter, once complete old store will be demolished.
ESC39-00002 Aging Inspection11/2/201511/2/201511/2/2015 9:08:22 AM CANC
sample permit entry, not active construction. Inspector module sampling complete
ESC39-00002 DOC - Permit Finaled11/2/201511/2/201511/2/2015 9:07:43 AMPPASS
ESC15-00221 General Inspection11/2/201511/2/201511/2/2015 9:06:39 AM PASS
ESC15-00006 General Inspection11/2/201511/2/201511/2/2015 8:48:24 AM PASS
WIP on home grounds and pool. No trackout or loose sediment leaving site. Trash and waste material is contained.