Inspections for the day of: Wednesday, November 2, 2016.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR16-00694 INSP-Sprinkler Rough-in11/1/201611/2/201611/2/2016 3:19:28 PMPPASS
Rough-in passed. Piping can be covered.
FIR15-00683 INSP-Final Inspection11/2/201611/2/201611/2/2016 3:17:05 PMPPASS
permit finaled
BLD16-03934 FIRE-Final Inspection11/2/201611/2/201611/2/2016 2:39:23 PMPCANC
Not ready for a final yet due to cordination with contractor to perform the smoke evac. test. Bill Phone #: ###-####
FIR16-00528 INSP-Final Inspection11/2/201611/2/201611/2/2016 2:30:57 PMPPASS
Permit finaled
FIR16-00495 INSP-Final Inspection11/2/201611/2/201611/2/2016 2:03:23 PMPPASS
Permit finaled
FIR16-00455 INSP-Sprinkler Rough-in/Hydro11/2/201611/2/201611/2/2016 2:01:39 PMPFAIL
Underground hydro test failed because when I came back to verify pressure some one had removed the guage. So no test was performed.
FIR16-00640 INSP-Sprinkler Rough-in/Hydro11/1/201611/2/201611/2/2016 2:00:42 PMAPART
Rough-in passed for the most part except ron stated that he is going to install 401 canopies on the second floor due to light fixture obstructions and the electrician is going to move the lights 3' away on the first floor. So another rough-in will be needed and another hydro test for the overhead system. Pipe sizing and hangers are ok.
FIR16-00665 INSP-Sprinkler Rough-in11/2/201611/2/201611/2/2016 1:23:41 PMPPART
Underground supply piping is ok to cover except for the areas where thrust blocks need to be poured.
BLD16-03702 FIRE-Final Inspection10/28/201611/2/201611/2/2016 12:42:45 PMAPASS
Life safety passed. Revised floor plan was provided in an email from plan review. Correct hardware and sticker to be installed prior to a building inspection
FIR16-00440 INSP-Sprinkler Rough-in/Hydro10/31/201611/2/201611/2/2016 12:15:13 PMPPASS
Tenting passed. Piping can be covered.
BLD15-00890 FIRE-Final Inspection11/2/201611/2/201611/2/2016 11:27:13 AMPFAIL
Still need the emergency light on the second floor northwest corner repaired. All other items have been corrected.
FIR16-00443 INSP-Final Inspection11/1/201611/2/201611/2/2016 10:37:40 AMAFAIL
Needed an above ground hydro test which passed. Final to be rescheduled for tomorrow morning.
BLD15-01139 FIRE-Final Inspection11/1/201611/2/201611/2/2016 9:56:01 AMAPASS
Life safety passed. Contractor to provide self luminous exit signs at the gates as per the building review note 10
BLD16-01107 FIRE-Final Inspection11/1/201611/2/201611/2/2016 9:02:04 AMAPASS
Life safety passed
FIR16-00439 INSP-Final Inspection11/1/201611/2/201611/2/2016 9:01:44 AMAPASS
Permit finaled