ELE00-04486
| Final | 11/17/2000 | 11/20/2000 | 11/20/2000 12:00:00 AM | A | PASS |
|
|
Dawn ###-####. mobile home perm/svc connection, idaho power has already connected to power. 11/20/2000 10:51:48 AM
|
ELE00-04488
| Final | 11/17/2000 | 11/20/2000 | 11/20/2000 12:00:00 AM | A | PASS |
|
|
###-####. two unit heaters, branch feeds. 11/20/2000 10:52:10 AM 11/20/2000 10:53:19 AM
|
ELE00-04492
| Temporary Service | 11/20/2000 | 11/20/2000 | 11/20/2000 12:00:00 AM | P | CANC |
|
|
bob ###-#### t/p CANCEL PER BOB
|
ELE00-00326
| Final | 11/20/2000 | 11/20/2000 | 11/20/2000 12:00:00 AM | P | PART |
|
|
conference; ele r/i adition. 11/20/2000 5:10:10 PM
|
ELE00-03398
| Final | 11/20/2000 | 11/20/2000 | 11/20/2000 12:00:00 AM | P | PART |
|
|
FN CHRIS-- ###-####. completed. 11/20/2000 5:05:57 PM
|
ELE00-02784
| Electrical Rough-In | 11/20/2000 | 11/20/2000 | 11/20/2000 12:00:00 AM | P | PASS |
|
|
conf only \\call first ###-#### or ###-#### Dan
conference; code requirements, basement circuits. 11/20/2000 5:07:21 PM
|
ELE00-02881
| Final | 11/20/2000 | 11/20/2000 | 11/20/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/20/2000 at 10:39:23. Contact: ###-####. temporary occupancy. 11/20/2000 5:08:02 PM
|
ELE00-04392
| Electrical Rough-In | 11/17/2000 | 11/20/2000 | 11/20/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/17/2000 at 13:44:10. Contact: ###-####. a wall rough in insp late pm if possible. walls ele r/i. 11/20/2000 5:08:37 PM
|