MEC02-03403
| Final | 11/19/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/19/2002 at 16:08:05. Contact: ###-####.Left c/non door, unable to locate make up air source. 11/20/2002 11:24:30 AM
|
MEC02-03403
| Final | 11/19/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/19/2002 at 16:08:05. Contact: ###-####.Left c/non door, unable to locate make up air source. 11/20/2002 11:24:30 AM
|
BLD02-02705
| BLD-Foundation | 11/19/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | A | PART |
|
|
###-####. walls poured no plans on site. 11/20/2002 12:22:23 PM
|
MEC02-03409
| Final | 11/19/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | A | FAIL |
|
|
###-####; Phone #: ###-#### Internet Inspection Request from: Trina Stracener .c/n posted. 11/20/2002 10:54:42 AM
|
MEC02-02934
| Final | 11/18/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | A | PASS |
|
|
homeowner- lonsdale ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD02-00534
| BLD-Framing/Rough-in | 11/19/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | A | PASS |
|
|
sheer wall ###-#### angie
|
BLD02-01275
| BLD-Final | 11/19/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson
|
MEC02-03340
| Rough-in | 11/19/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Michelle Evansc/n fresh air. 11/20/2002 10:22:10 AM
|
MEC02-03403
| Final | 11/20/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | A | PASS |
|
|
type II hood and make up air only item of permit. ok work complete. 11/20/2002 11:37:49 AM
|
BLD02-02488
| BLD-Framing/Rough-in | 11/20/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | P | FAIL |
|
|
c/n posted. 11/20/2002 2:45:17 PM
|
BLD02-01851
| BLD-Framing/Rough-in | 11/20/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | P | PART |
|
|
Conference only with jim from steed, the schell needs an interior frame inspection prior to ve framing for tennant , went over this with steed as they are not doing the tennent improvement, did note some items for interior frame with jim at the shear inspections, a side wall strap was needed at the east wall and some anchor bolts at plate breaks. This will be called in for an am inspection. 11/20/2002 3:59:30 PM
|
BLD02-02453
| BLD-Final | 11/19/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | P | NR |
|
|
mark--pending fire insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieneeds fire/life safety prior to calling for final contractor had be previously told. 11/20/2002 4:55:02 PM
|
MEC02-02985
| Final | 11/19/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson
|
BLD02-00467
| BLD-Framing/Rough-in | 11/18/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | P | CANC |
|
|
###-####OUT OF TIME THIS DAY. 11/20/2002 5:16:50 PM
|
MEC02-03068
| Final | 11/18/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | P | FAIL |
|
|
Thank You :); Phone #: ###-#### Internet Inspection Request from: Lisa Whitneyc/n posted. 11/20/2002 3:16:04 PM
|
MEC02-03325
| Rough-in | 11/20/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | P | PART |
|
|
###-####. This is ok subject to return air chase, that was useing an out side wall, with no insulation or vappor barrier, contractor has attempted to resolve but has been done incorrectly, now the drywall has been removed and insulation will be put in by the insulation company. 11/20/2002 5:11:53 PM
|
MEC02-03325
| Pressure Test | 11/20/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | P | FAIL |
|
|
###-####. Note this pipe has a slow leak.c/n posted again. 11/20/2002 5:08:50 PM
|
MEC02-03288
| Final | 11/20/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | P | FAIL |
|
|
key in mailbox opens upper deadbolt and back door; Phone #: ###-#### Internet Inspection Request from: Trina Stracener. Prior c/n items not addressed and or completed posted 2 nd c/n. 11/20/2002 1:32:40 PM
|
BLD02-02680
| BLD-Foundation | 11/20/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | P | PART |
|
|
###-####
|
BLD02-02488
| BLD-Framing/Rough-in | 11/20/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | P | FAIL |
|
|
###-####. Need approved plans on site. 11/20/2002 2:01:08 PM
|
BLD02-01686
| BLD-Framing/Rough-in | 11/20/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | P | NR |
|
|
fr jack- ###-#### . Needs foam seal package, truss details in order, noted some missing they had recovered them from the trash,also needs a gas test .c/n posted.11/20/2002 4:56:20 PM 11/20/2002 5:08:15 PM
|
MIS02-00302
| BLD-Conference | 11/20/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | P | FAIL |
|
|
###-#### bryan. Needs other inspections and floor plan.17 PM 11/20/2002 2:52:57 PM
|
MEC02-03434
| Rough-in | 11/20/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | P | CANC |
|
|
RYAN ###-####OUT OF TIME THIS DAY. 11/20/2002 5:17:03 PM
|
MEC02-03434
| Pressure Test | 11/20/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | P | CANC |
|
|
RYAN ###-####OUT OF TIME THIS DAY. 11/20/2002 5:17:17 PM
|