FIR02-00372
| INSP-Final Inspection | 11/19/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | A | FAIL |
|
|
provide mechanical plans, provide additional duct smoke detectors as required and resubmit plans for review, duct detectors did not shut down the hvac units as required, remove all non functioning fire alarm devices (old system), and relocate the manual pull stations as per the review comments.. NO OTHER ITEMS VERIFIED OR TESTED 11/20/2002 11:11:31 AM
|
FIR02-00434
| INSP-Final Inspection | 11/19/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | A | FAIL |
|
|
can't give final until the ceiling tile is installed but the sprinkler piping can be covered 11/20/2002 9:03:13 AM
|
FIR02-00407
| INSP-Sprinkler Rough-in/Hydro | 11/19/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | A | PASS |
|
|
rough-in for the inrack sprinklers is ok, but they are not tied into the riser yet. The hydro test is ok. The wrong sprinkler heads have been installed and require changed or reapproved. The hose valve connection is incorrect 11/20/2002 3:59:00 PM
|
BLD02-02453
| FIRE-Final Inspection | 11/19/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | A | FAIL |
|
|
provide approved door hardware on the main exit and provide duct smoke detectors for hvac shutdown. 11/20/2002 3:54:52 PM
|
BLD02-02453
| FIRE-Final Inspection | 11/19/2002 | 11/20/2002 | 11/20/2002 12:00:00 AM | A | FAIL |
|
|
provide approved door hardware on the main exit and provide duct smoke detectors for hvac shutdown. 11/20/2002 3:54:52 PM
|