Inspections for the day of: Tuesday, November 20, 2007.
Number of inspections: 13
Percentage of inspections complete: 85 %
Percentage of inspections not complete: 15 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-01603 BLD-Conference11/13/200711/14/2007 A 
jeremy Phone #: ###-####
BLD07-02403 BLD-Framing/Rough-in11/20/200711/20/200711/20/2007 5:50:30 PMPPART
soffit ok,, need plans to show
BLD07-02834 BLD-Footing11/20/200711/20/200711/20/2007 4:54:40 PMPPART
sabastian Phone #: ###-####
poured
BLD07-02755 BLD-Framing/Rough-in11/19/200711/20/200711/20/2007 4:34:23 PMPPART
justin Phone #: ###-####
suite 500 on 5th floor walls ok, need to verify more wall braces at ceiling grid inspection,, basement area not ready yet
BLD07-02114 BLD-Footing11/19/200711/20/200711/20/2007 4:01:05 PMPPART
###-####- john -call 1st before insp
ftgs poured,, foam 75% done for frost
BLD07-02114 BLD-Framing/Rough-in11/19/200711/20/200711/20/2007 3:58:55 PMPPASS
###-####- john -call 1st before insp
BLD07-02407 BLD-Framing/Rough-in11/19/200711/20/200711/20/2007 3:15:41 PMPPART
1:30 apt with rob and engineer Phone #: ###-####
conf w/ st. eng., and framer,, eng. will reinspect shear issues and provide letter of ok then I will look at interior shear
BLD07-02981 BLD-Framing/Rough-in11/19/200711/20/200711/20/2007 12:24:56 PMAPASS
joann - ok to cover Phone #: ###-####
BLD07-02945 BLD-Footing11/19/200711/20/200711/20/2007 12:23:45 PMAPASS
bryan or darin Phone #: ###-####
property pin in outside of fence line,, ok to pour
BLD07-02466 BLD-Footing11/19/200711/20/200711/20/2007 12:01:18 PMAPASS
Scheduled by a contractor via Hello! on 11/19/2007 at 11:36:31 PM. Contact: ###-####.
retaining walls ok
BLD07-02034 BLD-Framing/Rough-in11/19/200711/20/200711/20/2007 12:00:18 PMAPASS
Josh ###-####
ok to cover now
BLD07-01555 BLD-Framing/Rough-in11/19/200711/20/200711/20/2007 11:31:29 AMAPART
terry Phone #: ###-####
front columns ok pending special inspection on welds
BLD03-02782 BLD-Conference11/20/200711/20/2007 P 
Assesor's office call