BLD08-00195
| BLD-Framing/Rough-in | 11/20/2008 | 11/20/2008 | 11/20/2008 5:26:11 PM | P | PART |
|
|
doug Note: please call 1/2 prior to inspection Phone #: ###-#### ok to cover ext sofffits and covered porchs
|
BLD08-01843
| BLD-Energy code compliance | 11/19/2008 | 11/20/2008 | 11/20/2008 5:24:17 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/19/2008 at 12:46:44 PM. Contact: ###-####.
|
BLD08-00364
| BLD-Conference | 11/20/2008 | 11/20/2008 | 11/20/2008 2:33:07 PM | P | FAIL |
|
|
please call at least a half hour prior to inspection-Cheryl Todd-This is only for the garage area to check setbacks and approve final Phone #: ###-#### need to finsh hold downs on nailing sill plate to green plate
|
BLD07-02816
| BLD-Energy code compliance | 11/20/2008 | 11/20/2008 | 11/20/2008 2:30:43 PM | P | PASS |
|
|
mike - please call 1/2 hr prior Phone #: ###-####
|
BLD06-02303
| BLD-Conference | 11/20/2008 | 11/20/2008 | 11/20/2008 1:34:22 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/20/2008 at 9:53:42 AM. Contact: ###-####. talked about what needs to be completed to get a temp occ
|
BLD08-01133
| BLD-Final | 11/19/2008 | 11/20/2008 | 11/20/2008 11:48:05 AM | A | NR |
|
|
jeff Phone #: ###-#### walked project with contractor he also needs a fire life saftey final
|
BLD06-01451
| BLD-Framing/Rough-in | 11/20/2008 | 11/20/2008 | 11/20/2008 9:58:02 AM | A | FAIL |
|
|
Dave; Could we do a "dry run" on L7. I have most,if not all, the info you needed.
Thanks,Bob Phone #: ###-#### Internet Inspection Request from: bob austin
|