Inspections for the day of: Thursday, November 20, 2008.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00938 Site Preparation11/20/200811/20/200811/20/2008 4:19:13 PM PASS
ESC08-00706 Tracking Control11/20/200811/20/200811/20/2008 4:00:18 PMPPASS
2:00PM
ESC08-00866 Site Preparation11/18/200811/20/200811/20/2008 3:06:14 PMAFAIL
Correction notice to the RP:
1 Clean up all sediment back into the lot off of the private drive.
2. Install all BMP's per the ESC plan.
Failure to comply will result in a stop work order. Will re-inspect on 11/24/08 AM
ESC08-00748 BMP Violation11/18/200811/20/200811/20/2008 2:36:49 PMAPASS
ESC08-00763 BMP Violation11/18/200811/20/200811/20/2008 2:35:41 PMAFAIL
Spoke with RP.
1. Provide a concrete washout pit.
2. Claen up and remove or place into pit of the concrete spoil pile on lot and the lot to the east.
3. Maintain silt fence in the back of lot.
Will re-inspect on 11/21/08 PM.
ESC08-00225 Random Inspection11/20/200811/20/200811/20/2008 2:21:20 PMPFAIL
Need to cover stock pile in the parking lot.
ESC08-00985 Site Preparation11/20/200811/20/200811/20/2008 1:34:16 PM PART
Due to the potental storm event. I discussed with the RP to cover the pile. He said it will be done prior to the rain.
ESC08-00968 Site Preparation11/20/200811/20/200811/20/2008 11:42:28 AM DONE
ESC08-00178 Conference11/20/200811/20/200811/20/2008 11:14:13 AMPDONE
Went over the the sub contractor (Lure Construction) over what perventitive measures that need to take place on 11/22/08 when filling the inside of the parking garage. Where to stage the fill and all BMP's that will be required.
ESC08-00411 General Inspection11/20/200811/20/200811/20/2008 10:14:09 AM FAIL
Need to maintain BMP's in the front section of the projetc area. Will re-inspect on 11/24/08
ESC08-00869 BMP Violation11/19/200811/20/200811/20/2008 10:05:02 AMAPART
Spoke with the RP. Was told that he is waiting on the Waste company to come and empty the waste bin. Also due no room for a washout he will instruct the concrete company to washout back at the batch plant.
ESC07-00359 Conference11/19/200811/20/200811/20/2008 9:17:16 AMADONE
Discussed with Rp over installing a construction entrance off of Smoke HOuse into the sub division. Also told to eliminating tracking off of dirt to close up the street extention access points with high visability fence and T-Posts. Will re-inspect on 11/24/08 AM.
ESC08-00706 Tracking Control11/20/200811/20/200811/20/2008 8:41:44 AMAFAIL
Left a message with RP.
Clean up tracking along Maple Grove. Also need to close off access point so no further tracking can be genarated. Will re-inspect today in the PM.