FIR09-00659
| INSP-Sprinkler Rough-in | 11/20/2009 | 11/20/2009 | 11/20/2009 4:49:45 PM | P | PART |
|
|
Overhead modifications at the tenant remodel are approved for ceiling cover, penetrations at the new one hour rated hall still need fire caulked.
|
FIR09-00627
| INSP-Sprinkler Rough-in/Hydro | 11/20/2009 | 11/20/2009 | 11/20/2009 4:46:38 PM | P | PART |
|
|
Install okayed as noted.
|
FIR08-00667
| INSP-Final Inspection | 11/19/2009 | 11/20/2009 | 11/20/2009 4:46:02 PM | A | PASS |
|
|
Remainder of fire alarm system work passed site testing, permit final okayed.
|
FIR09-00617
| INSP-Final Inspection | 11/19/2009 | 11/20/2009 | 11/20/2009 4:44:36 PM | A | PART |
|
|
Vesda scanner and fire alarm system interconnections passed inspection, notification devices not tested at this time.
|
BLD09-01978
| FIRE-Final Inspection | 11/19/2009 | 11/20/2009 | 11/20/2009 2:25:43 PM | A | PASS |
|
|
Life safety passed, one PFE located and installed while on site.
|
BLD09-01978
| FIRE-Conference | 11/20/2009 | 11/20/2009 | 11/20/2009 2:24:43 PM | A | DONE |
|
|
Regarding project related life safety conditions for occupancy approvals.
|
BLD09-01937
| FIRE-Final Inspection | 11/20/2009 | 11/20/2009 | 11/20/2009 2:22:40 PM | A | FAIL |
|
|
Correction items include one blocked fire sprinkler head by an adjacent curtain at the server counter, door hardware at the bar area is not approved, missing the 2A10BC fire extinguisher, post signage at the main entry/exit " door to remain........", provide approved hardware at the second exit door (kitchen area).
|
BLD09-00972
| FIRE-Final Inspection | 11/20/2009 | 11/20/2009 | 11/20/2009 2:18:15 PM | A | PASS |
|
|
Items on correction notice have been completed, fire life safety inspection passed.
|
FIR09-00548
| INSP-Final Inspection | 11/19/2009 | 11/20/2009 | 11/20/2009 2:17:24 PM | A | PASS |
|
|
Remainder of fire alarm work passed inspection, corrections finished, permit final approved.
|
FIR09-00476
| INSP-Final Inspection | 11/19/2009 | 11/20/2009 | 11/20/2009 2:15:49 PM | A | PASS |
|
|
Correction items field verified for compliance, final walkthrough passed, permit finaled.
|