MEC09-03010
| Final | 11/19/2009 | 11/20/2009 | 11/20/2009 4:50:15 PM | P | PASS |
|
|
furnace in basement, entrance in back down stairs. contact mike 6957435 Phone #: ###-#### Internet Inspection Request from: Michael Novak
|
MEC09-02986
| Final | 11/20/2009 | 11/20/2009 | 11/20/2009 4:38:19 PM | P | PASS |
|
|
Internet Inspection Request from: Veronica Shipley..bath exhaust only
|
MEC09-03014
| Rough-in | 11/20/2009 | 11/20/2009 | 11/20/2009 4:37:13 PM | P | PASS |
|
|
Doug if possible late in the day please call before going out Phone #: ###-####
|
MEC09-02980
| Final | 11/18/2009 | 11/20/2009 | 11/20/2009 4:02:43 PM | P | PASS |
|
|
INSTALLER JAROD ###-#### Phone #: ###-#### Internet Inspection Request from: Veronica Shipley
|
MEC09-03023
| Pressure Test | 11/20/2009 | 11/20/2009 | 11/20/2009 3:38:20 PM | P | PASS |
|
|
clay
|
MEC09-03000
| Final | 11/19/2009 | 11/20/2009 | 11/20/2009 3:20:02 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Frank Marturello
|
MEC09-02809
| Pressure Test | 11/20/2009 | 11/20/2009 | 11/20/2009 3:08:45 PM | P | PASS |
|
|
reinspect gas test at range
|
MEC09-02957
| Final | 11/17/2009 | 11/20/2009 | 11/20/2009 3:07:37 PM | P | PASS |
|
|
INSTALLER JEREMY ###-#### Phone #: ###-#### Internet Inspection Request from: Veronica Shipley
|
MEC09-02211
| Conference | 11/20/2009 | 11/20/2009 | 11/20/2009 2:29:52 PM | P | PASS |
|
|
Bennett Phone #: ###-####...job complete
|
GCM09-00033
| GCM-Final | 11/20/2009 | 11/20/2009 | 11/20/2009 2:02:43 PM | P | PASS |
|
|
|
GCM09-00033
| GCM-Rough-in | 11/19/2009 | 11/20/2009 | 11/20/2009 2:02:27 PM | A | PASS |
|
|
|
MEC09-03019
| Rough-in | 11/20/2009 | 11/20/2009 | 11/20/2009 12:24:40 PM | P | PASS |
|
|
robin ###-####
|
MEC09-03001
| Rough-in | 11/19/2009 | 11/20/2009 | 11/20/2009 12:00:01 PM | A | PASS |
|
|
office Phone #: ###-####
|
MIS09-00219
| MEC-Conference | 11/20/2009 | 11/20/2009 | 11/20/2009 11:24:23 AM | A | PEND |
|
|
looked at 2 ovens they wanted to install in the new pastry shop. neither one of them is listed so i told them not to install them
|
MEC09-02809
| Final | 11/19/2009 | 11/20/2009 | 11/20/2009 11:22:08 AM | A | PART |
|
|
Tom Phone #: ###-####...gas to range ok..need 36" clearance from top of range to overhead combustible
|
MEC09-03002
| Conference | 11/19/2009 | 11/20/2009 | 11/20/2009 10:15:18 AM | A | FAIL |
|
|
took out old fireplace put new fireplace in Phone #: ###-#### Internet Inspection Request from: rene neumeyer....need manuf specs and need to see clearances and venting
|
MEC09-02708
| Final | 11/20/2009 | 11/20/2009 | 11/20/2009 9:43:05 AM | A | FAIL |
|
|
this should have been a final...not a conference...unit needs to be opened up so i can see the venting..do not fire this off until inspected
|
MEC09-02708
| Conference | 11/16/2009 | 11/20/2009 | 11/20/2009 9:40:10 AM | A | CANC |
|
|
installation of a pellet insert. Phone #: ###-#### Internet Inspection Request from: David Hurds...i rescheduled this for a final
|
MEC09-02994
| Final | 11/20/2009 | 11/20/2009 | 11/20/2009 9:35:07 AM | A | PASS |
|
|
test to existing f/p per int gas
|
MEC09-02991
| Final | 11/20/2009 | 11/20/2009 | 11/20/2009 9:17:05 AM | P | PASS |
|
|
|