FIR12-00460
| FIR-Aging Inspection | 11/20/2012 | 11/20/2012 | 11/23/2012 4:50:44 PM | | DONE |
|
|
Site work in progress, construction underway.
|
FIR11-00689
| INSP-Final Inspection | 11/20/2012 | 11/20/2012 | 11/20/2012 5:38:57 PM | A | PASS |
|
|
|
FIR11-00301
| INSP-Final Inspection | 11/20/2012 | 11/20/2012 | 11/20/2012 5:38:34 PM | A | PASS |
|
|
|
BLD12-01741
| FIRE-Sprinkler Rough-in | 11/20/2012 | 11/20/2012 | 11/20/2012 5:23:52 PM | P | PART |
|
|
Overhead fire sprinkler work approved for cover at the sheetrock ceilings.
|
BLD12-00413
| FIRE-Final Inspection | 11/19/2012 | 11/20/2012 | 11/20/2012 5:22:33 PM | P | PASS |
|
|
Previous correction items field verified for completion. Door hardware repaired at the laundry service room and lock/hasp removed at one storage room while on site.
|
BLD12-01281
| FIRE-Sprinkler Rough-in | 11/20/2012 | 11/20/2012 | 11/20/2012 5:19:33 PM | A | PASS |
|
|
Project related fire sprinkler permit finaled.
|
BLD12-01740
| FIRE-Sprinkler Rough-in | 11/20/2012 | 11/20/2012 | 11/20/2012 5:16:36 PM | A | PART |
|
|
Overhead fire sprinkler work okay to cover.
|
BLD09-01405
| FIRE-Conference | 11/19/2012 | 11/20/2012 | 11/20/2012 5:15:22 PM | A | DONE |
|
|
On site conference with tenant rep. regarding overspaced fire sprinkler coverage at one room. The posted fire extinguisher is overdue annual certification. Upon completion of C/N items, fire life safety can be passed.
|