BLD12-01789
| BLD-Final | 11/19/2012 | 11/20/2012 | 11/20/2012 2:58:34 PM | P | PASS |
|
|
rich Phone #: ###-####. ok for perm occ.
|
ESC12-00736
| Site Final | 11/20/2012 | 11/20/2012 | 11/20/2012 2:51:05 PM | P | NR |
|
|
|
BLD12-01881
| BLD-Final | 11/19/2012 | 11/20/2012 | 11/20/2012 1:47:03 PM | P | FAIL |
|
|
Cameron-please call for access code Phone #: ###-####. Provide the blower door test result and energy cert.
|
BLD12-00683
| BLD-Framing/Rough-in | 11/20/2012 | 11/20/2012 | 11/20/2012 12:33:12 PM | A | PART |
|
|
perliminary walk through only. Still waiting on trades. no cover at this time.
|
BLD12-02821
| BLD-Foundation | 11/16/2012 | 11/20/2012 | 11/20/2012 10:35:37 AM | A | PART |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD12-00368
| BLD-Wall Bracing | 11/19/2012 | 11/20/2012 | 11/20/2012 9:12:33 AM | A | PART |
|
|
josh Phone #: ###-####. main level exterior wall bracing ok.
|
BLD12-02897
| BLD-Conference | 11/19/2012 | 11/20/2012 | 11/20/2012 8:53:43 AM | A | DONE |
|
|
Roof is complete thank you Phone #: ###-#### >> Inspection requested via web by Sandra Daffer
|
BLD12-02897
| DOC - Permit Finaled | 11/20/2012 | 11/20/2012 | 11/20/2012 8:53:29 AM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|