BLD15-04129
| FIRE-Final Inspection | 11/20/2015 | 11/20/2015 | 11/20/2015 11:21:37 AM | P | PASS |
|
|
Life safety passed
|
FIR12-00307
| INSP-Final Inspection | 11/13/2015 | 11/20/2015 | 11/20/2015 10:33:04 AM | A | FAIL |
|
|
Model of DSC panel installed does not match the approved drawings. Wiring between the FACP and the DSC panel is not instaleed in conduit as required. No actual testing performed.
|
FIR15-00010
| INSP-Sprinkler Rough-in/Hydro | 11/18/2015 | 11/20/2015 | 11/20/2015 9:13:11 AM | A | CANC |
|
|
wrong inspection type called in
|
FIR14-00692
| INSP-Sprinkler Rough-in/Hydro | 11/18/2015 | 11/20/2015 | 11/20/2015 9:12:45 AM | A | CANC |
|
|
wrong inspection type called in
|
FIR14-00692
| INSP-Final Inspection | 11/20/2015 | 11/20/2015 | 11/20/2015 9:12:08 AM | P | PASS |
|
|
Permit finaled
|
FIR15-00010
| INSP-Final Inspection | 11/20/2015 | 11/20/2015 | 11/20/2015 9:10:53 AM | P | PASS |
|
|
Permit finaled
|
FIR15-00737
| INSP-Sprinkler Rough-in | 11/19/2015 | 11/20/2015 | 11/20/2015 9:07:24 AM | A | PASS |
|
|
Piping is ok to cover. A branch line restraint is required on the new branch line. This can be verified at the final.
|