ELE17-03835
| Permanent Service | 11/20/2017 | 11/20/2017 | 11/20/2017 2:29:07 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jake Cutler p/s u/g rec ok
|
ELE16-02458
| Final | 11/16/2017 | 11/20/2017 | 11/20/2017 2:15:05 PM | P | PASS |
|
|
aging Phone #: ###-#### Inspection requested via web by Steve VanWinkle Ok final. Both signs present, UL listed.
|
ELE17-03931
| Final | 11/20/2017 | 11/20/2017 | 11/20/2017 1:50:00 PM | P | PASS |
|
|
Justin Metcalf ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Ok final 1 double duplex in tech closet.
|
ELE17-02904
| Final | 11/17/2017 | 11/20/2017 | 11/20/2017 1:49:18 PM | A | FAIL |
|
|
Please give Nick a call to meet you with a 30 minute heads up ###-####. If you have any questions please call Aaron ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clay Morgan 1. 406.4 (D)(2) b and c. 2. No arc fault protection for Mstr Bed. 3. All kitchen counter recepts to right of sink not GFI protected. 4. All outlets in kitchen need spark rings. Boxes are set back more than an 1/8" due to tile.
|
ELE17-03930
| Electrical Rough-In | 11/20/2017 | 11/20/2017 | 11/20/2017 12:48:30 PM | P | PASS |
|
|
inspect underground conduit for cover Phone #: ###-#### Inspection requested via web by Robert Schroder Ok cover trench for low volt. Trench is atleast 30"
|
ELE17-03929
| Electrical Rough-In | 11/20/2017 | 11/20/2017 | 11/20/2017 12:47:58 PM | P | PASS |
|
|
inspect underground conduit for cover Phone #: ###-#### Inspection requested via web by Robert Schroder Ok cover trench for low volt. Trench is atleast 30"
|
ELE16-01616
| Electrical Rough-In | 11/20/2017 | 11/20/2017 | 11/20/2017 12:43:57 PM | P | PASS |
|
|
Master bathroom floor heat Phone #: ###-#### Inspection requested via web by Jim Williams Ok cover floor heat mstr. baths.
|
ELE17-03923
| Electrical Rough-In | 11/19/2017 | 11/20/2017 | 11/20/2017 12:23:53 PM | P | PASS |
|
|
Partial rough-in inspection request. Phone #: ###-#### Inspection requested via web by Dan Surerus Ok cover front wall entry and ceiling. Up mstr bed/bath and garage except panel wall.
|
ELE17-02925
| Electrical Rough-In | 11/17/2017 | 11/20/2017 | 11/20/2017 10:12:36 AM | A | PASS |
|
|
last of the walls studio/kitchen and all the ceiling cover inspection Phone #: ###-#### Inspection requested via web by Karl Paige Ok cover kitchen walls and ceilings throughout.
|
ELE17-03233
| Final | 11/17/2017 | 11/20/2017 | 11/20/2017 9:50:08 AM | A | PASS |
|
|
Originally was scheduled for 11/18/17. Ok final. All straping and labeling present.
|
ELE17-02859
| Final | 11/19/2017 | 11/20/2017 | 11/20/2017 9:31:16 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot Ok final. Contractor took resposiblity for other work done by homeowner.
|
MIS17-00391
| Set Bond Amount | 11/17/2017 | 11/20/2017 | 11/20/2017 9:09:21 AM | A | DONE |
|
|
Possible electrical work being done. Posted notice on front window at 9:05 am on 11/20/17. I left my contact information.
|
ELE17-03819
| Electrical Rough-In | 11/17/2017 | 11/20/2017 | 11/20/2017 8:50:29 AM | A | PASS |
|
|
Sean Phone #: ###-#### Ok cover garage. Will need to see ground screws for exterior pancake boxes for front coach lights.A permanent service inspection will be needed prior to energize.
|
ELE17-03101
| Final | 11/16/2017 | 11/20/2017 | 11/20/2017 8:40:12 AM | A | PASS |
|
|
Call Bill @ ###-#### Phone #: ###-#### Inspection requested via web by Bill Litzebauer Ok final. No other work to be done.
|
ELE17-03101
| Permanent Service | 11/20/2017 | 11/20/2017 | 11/20/2017 8:39:40 AM | A | PASS |
|
|
p/s o/h n ok
|
ELE17-02847
| Final | 11/16/2017 | 11/20/2017 | 11/18/2017 3:48:28 PM | P | CANC |
|
|