Inspections for the day of: Monday, November 20, 2017.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Story
TitleELE-INSPECTOR
Phone #985-3493
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE17-02041 Final11/20/201711/20/201711/20/2017 3:48:32 PMPPASS
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Final ok, will pull new permit for wash bay
ELE17-03905 Final11/17/201711/20/201711/20/2017 2:15:31 PMPCANC
Mitch Phone #: ###-####
Needed rough-in
ELE17-03905 Electrical Rough-In11/20/201711/20/201711/20/2017 2:15:21 PMPPASS
Mitch Phone #: ###-####
Install for roftop condensing units ok and walk in cooler
ELE17-03912 Electrical Rough-In11/20/201711/20/201711/20/2017 1:25:25 PMPPASS
Randy. Wall cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy
2nd and 3rd floor walls only o to cover
ELE17-03886 Final11/18/201711/20/201711/20/2017 1:23:45 PMACANC
Add GFI service outlet for outdoor HVAC unit Phone #: ###-#### Inspection requested via web by Douglas Hackney
ELE17-03921 Electrical Rough-In11/19/201711/20/201711/20/2017 10:31:44 AMAPASS
contact home owner for access ###-#### David Zuares Phone #: ###-#### Inspection requested via web by Dave Brueggemann
Accessory out building Kitchen,living room,and bed&bath ok to cover
ELE17-03919 Temporary Service11/18/201711/20/201711/20/2017 9:45:53 AMAPASS
I left the last 12" of dirt off so you can see the ground rod. (I drove it to far)
Bob Phone #: ###-#### Inspection requested via web by Bob Glenn
t/s o/h n ok
ELE17-03757 Electrical Rough-In11/17/201711/20/201711/20/2017 9:09:34 AMAPASS
Please call 1 hr prior Brad (Foreman) @ ###-#### or Preston (Electrician) @ ###-#### if you have any questions. Thank you. Inspection requested via web by Christian Kilpatrick
Verified scope of work and install of solar array
MIS17-00392 ELE-Conference11/17/201711/20/201711/20/2017 8:41:26 AMADONE
Call that work is being done. Looks like the owner started pulling permits, but never paid and pulled a siding/window/roof permit when it should be a remodel(406) looking at his description
Owner stated she is still trying to pull permits for kitchen remodel and will submit prints once completed, also stated work wont be done for some months...