BLD99-01573
| BLD-Final | 11/20/2000 | 11/21/2000 | 11/21/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/20/2000 at 10:58:16. Contact: ###-####. rated door in basement need 60 min has 45 min door. 11/21/2000 11:36:11 AM
|
BLD00-02978
| BLD-Final | 11/20/2000 | 11/21/2000 | 11/21/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/20/2000 at 10:59:18. Contact: ###-####. final ok card being routed by wyane/ 11/21/2000 11:35:05 AM
|
BLD00-01845
| BLD-Framing/Rough-in | 11/20/2000 | 11/21/2000 | 11/21/2000 12:00:00 AM | A | PASS |
|
|
fr gene ###-#### for mech room ele & mech access ok 11/21/2000 1:30:03 PM
|
BLD00-01834
| BLD-Footing | 11/20/2000 | 11/21/2000 | 11/21/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 11/20/2000 at 13:26:39. Contact: ###-####. placed with special insp. pending report. 11/21/2000 12:44:49 PM
|
BLD00-02026
| BLD-Footing | 11/20/2000 | 11/21/2000 | 11/21/2000 12:00:00 AM | P | PART |
|
|
FT INSP-- DUTCH- CELL ###-#### -INTERIOR FT ft at f-14 spoke with brian smith eng. ok to oversize w/1#4 bar each way to acomadate pipe entrution. 11/21/2000 11:34:06 AM
|
BLD00-01563
| BLD-Concrete | 11/20/2000 | 11/21/2000 | 11/21/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/20/2000 at 18:37:36. Contact: ###-####. placed with special insp pending report. 11/21/2000 2:50:02 PM
|
BLD00-01947
| BLD-Final | 11/21/2000 | 11/21/2000 | 11/21/2000 12:00:00 AM | P | PASS |
|
|
key on top of brick molding above back door- dale ###-#### -fn l/c ok. 11/21/2000 4:25:24 PM
|
BLD00-01947
| BLD-Final | 11/21/2000 | 11/21/2000 | 11/21/2000 12:00:00 AM | P | PASS |
|
|
key on top of brick molding above back door- dale ###-#### -fn l/c ok. 11/21/2000 4:25:24 PM
|
BLD00-02493
| BLD-Framing/Rough-in | 11/21/2000 | 11/21/2000 | 11/21/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 10:02:19. Contact: ###-####. soffit vents lessthan 6 inches with gyp protection ok. 11/21/2000 3:32:39 PM
|
BLD99-02185
| BLD-Framing/Rough-in | 11/21/2000 | 11/21/2000 | 11/21/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 10:37:10. Contact: ###-####. coridor plm/screws on 12 inch ceilling and clips/light wires and seismic pods./putty pads 2 loc corrdor. 11/24/2000 12:44:48 PM
|
MEC00-01374
| Pressure Test | 11/21/2000 | 11/21/2000 | 11/21/2000 12:00:00 AM | P | FAIL |
|
|
re-insp pres test brent ###-#### key is in water heater room/
|
MEC00-03853
| Final | 11/21/2000 | 11/21/2000 | 11/21/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 11:06:53. Contact: ###-####. late pm ??
|
MEC00-04072
| Final | 11/21/2000 | 11/21/2000 | 11/21/2000 12:00:00 AM | P | PASS |
|
|
FN RUTH-- CALL 1ST BEFORE INSP - ###-#### HOMEOWNER
|