PLM01-03866
| Water Softner Final | 11/20/2001 | 11/21/2001 | 11/21/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/20/2001 at 09:18:20. Contact: ###-####. still need to run the recycle line 11/21/2001 3:20:49 PM
|
PLM01-02296
| Plumbing Rough-in | 11/20/2001 | 11/21/2001 | 11/21/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/20/2001 at 13:22:00. Contact: ###-####.
|
PLM01-03975
| Plumbing Rough-in | 11/21/2001 | 11/21/2001 | 11/21/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM01-03976
| Sprinkler (Final) | 11/21/2001 | 11/21/2001 | 11/21/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM01-03977
| Water and/or Sewer | 11/21/2001 | 11/21/2001 | 11/21/2001 12:00:00 AM | P | PASS |
|
|
water line- mike ###-#### water service meter to outside foundation ok, sprinkler tie in ok still needs a permit and test and inspection 11/21/2001 1:38:24 PM
|
PLM01-03916
| Plumbing Rough-in | 11/21/2001 | 11/21/2001 | 11/21/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/21/2001 at 10:33:27. Contact: ###-####.
|
PLM01-02451
| Final | 11/21/2001 | 11/21/2001 | 11/21/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/21/2001 at 10:52:39. Contact: ###-####. set sink in coference room, hook up dishwasher,no air gap fitting required, install st-12 expantion tank at water heater, solid covers required at the interceptor, fill interceptor for test, verify interceptor discharge dip tube is capped, lift station must be operational. 11/21/2001 4:16:52 PM
|
PLM01-03962
| Water and/or Sewer | 11/21/2001 | 11/21/2001 | 11/21/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 330 On 11/21/2001 2:36:45 PM well disconnect and water service final ok
|
PLM01-02823
| Final | 11/21/2001 | 11/21/2001 | 11/21/2001 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 330 On 11/21/2001 4:18:14 PM soild covers on interceptor, fill interceptor for test, verify interceptor discharge dip tube is capped, lift station must be operational
|