Inspections for the day of: Wednesday, November 21, 2001.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-01402 Final11/20/200111/21/200111/21/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/20/2001 at 13:21:04. Contact: ###-####. fasten down dishwasher and hose bib,s finish caulking fix leak on valve in mech. room 11/21/2001 12:14:51 PM
PLM01-03967 Water and/or Sewer11/20/200111/21/200111/21/2001 12:00:00 AMAPASS
###-####
PLM01-02494 Final11/21/200111/21/200111/21/2001 12:00:00 AMAPART
###-#### DAN need to repipe roof and overflow drain lines with approved d.w.v. drainage fitting,s support drain lines to wall both roof and overflow lines need to be tested 11/21/2001 5:21:42 PM
PLM01-02312 Final11/21/200111/21/200111/21/2001 12:00:00 AMPPART
FN -LENNY -- ###-#### need to have walk through with Bill Tomphson and plumbing contractor 11/21/2001 5:24:36 PM
PLM01-03980 Plumbing Rough-in11/21/200111/21/200111/21/2001 12:00:00 AMPPART
ERIC ###-#### this inspection for sprinkler final tie in ok - ok to cover backflow device still need,s to be certified contractor to recall when ready 11/21/2001 3:59:51 PM
PLM01-03820 Plumbing Rough-in11/20/200111/21/200111/21/2001 12:00:00 AMPPART
KORT ###-#### change powder room toilet vent to two inch need cleanout in washer drain line 11/21/2001 4:55:51 PM
PLM01-03978 Water and/or Sewer11/21/200111/21/200111/21/2001 12:00:00 AMPPASS
###-#### SEWER TURNAROUND\SEWER LINE