Inspections for the day of: Thursday, November 21, 2002.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-02321 BLD-Framing/Rough-in11/20/200211/21/200211/21/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 11/20/2002 at 14:44:44. Contact: ###-####. need trades ok'd, resubmit for duct wrap; ok to pre rock behind elec panels, etc 11/21/02 11:15:32 AM
BLD02-01851 BLD-Framing/Rough-in11/20/200211/21/200211/21/2002 12:00:00 AMAPART
see notes under last inspection. 11/20/2002 5:20:46 PM; c/n re: complete coil strap/blocks at east wall, firestopping...ok to insul "shell" side... 11/21/02 10:38:08 AM
BLD02-02704 BLD-Conference11/20/200211/21/200211/21/2002 12:00:00 AMAPASS
###-#### JACK w/ RA Schultz..re existing stairs... width ok to use...approx 35". 11/21/02 9:53:56 AM
BLD01-02970 BLD-Final11/20/200211/21/200211/21/2002 12:00:00 AMANR
DAVE; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
MIS02-00301 BLD-Final11/20/200211/21/200211/21/2002 12:00:00 AMANR
DAVE; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ...need fire? 11/21/02 12:56:00 PM
BLD02-01320 BLD-Final11/20/200211/21/200211/21/2002 12:00:00 AMPPASS
###-####...lc issued, has $4000 bond for possible variance for "overheight "retaining wall at front set-back... 11/21/02 4:02:03 PM
BLD02-02174 BLD-Framing/Rough-in11/20/200211/21/200211/21/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/20/2002 at 14:28:43. Contact: ###-####....ok to cover int's, still need as-built for porch col's. 11/21/02 4:47:36 PM
BLD02-02175 BLD-Framing/Rough-in11/20/200211/21/200211/21/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/20/2002 at 14:29:51. Contact: ###-####....ints ok to cover...need as-builts for porch const, advised bldr to verify t.steel deck framing vs. spans for decking (trex?) 11/21/02 4:49:19 PM
BLD01-02378 BLD-Framing/Rough-in11/20/200211/21/200211/21/2002 12:00:00 AMPFAIL
###-####, add full hd studs at east wing wall, nail off all...ok to continue, get ele ok for full frame insp 11/21/02 3:43:26 PM
BLD02-02065 BLD-Framing/Rough-in11/21/200211/21/200211/21/2002 12:00:00 AMPPART
rob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...restrooms; need resub re proposed facade framing 11/21/02 5:20:11 PM
BLD02-02349 BLD-Final11/21/200211/21/200211/21/2002 12:00:00 AMPPASS
Korry, ###-#### (old Veltex Station)
BLD02-01851 BLD-Conference11/21/200211/21/200211/21/2002 12:00:00 AMPPASS
w/ Steed...left c/n, but ok to insulate. 11/21/02 1:53:04 PM
MIS02-00301 BLD-Final11/21/200211/21/200211/21/2002 12:00:00 AMPPASS
ok for c/o... 11/21/02 3:00:49 PM
BLD01-02970 BLD-Conference11/21/200211/21/200211/21/2002 12:00:00 AMPPASS
###-####...re final r'eq's, will resubmit to delete work at "unfinished"... 11/21/02 3:12:25 PM
MIS02-00175 BLD-Conference11/21/200211/21/200211/21/2002 12:00:00 AMPPASS
grading