PLM02-03552
| Final | 11/20/2002 | 11/21/2002 | 11/21/2002 12:00:00 AM | A | PART |
|
|
###-#### unable to see premise protection may have to have recertified R.P. for soda tower need to be recertified. need to rehang hand sink by 3-comp. sink approved plan,s show 1/2 inch new line to evaporator need to install and may require back flow protection 11/21/2002 11:49:06 AM
|
PLM02-03130
| Final | 11/20/2002 | 11/21/2002 | 11/21/2002 12:00:00 AM | A | PASS |
|
|
|
PLM02-03530
| Water and/or Sewer | 11/21/2002 | 11/21/2002 | 11/21/2002 12:00:00 AM | P | PART |
|
|
###-#### bruce new sewer line,s for trailer spaces 12 through 18 water test ok 11/21/2002 4:46:42 PM
|
PLM02-03122
| Plumbing Rough-in | 11/21/2002 | 11/21/2002 | 11/21/2002 12:00:00 AM | P | FAIL |
|
|
###-#### need to perform general testing on gas and vacuum systems as per NFPA 99C 1999 edition 4-5.4.1.1, 4-5.4.2.1 and 4-5.4.3 11/21/2002 4:26:08 PM
|