Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR02-00359 INSP-Final Inspection11/19/200211/21/200211/21/2002 12:00:00 AMAPART
The areas inspected and passed for this part of the phase are marked on the job site plans. Current draw for the nac panels is greater than what is stated on the calcs. Contractor needs to install the 10 ah batteries as stated on the plans, label the remote leds, repair one exit sign 11/21/2002 10:27:50 AM
BLD00-00670 FIRE-Final Inspection11/20/200211/21/200211/21/2002 12:00:00 AMAPASS
Earl, ###-####
BLD00-00671 FIRE-Final Inspection11/20/200211/21/200211/21/2002 12:00:00 AMAPASS
Earl, ###-####
BLD00-00672 FIRE-Final Inspection11/20/200211/21/200211/21/2002 12:00:00 AMAFAIL
provide curb striping as per conversation, provide updated tags on the fire extinguishers, and repair smoke detector in 5692 11/21/2002 11:03:44 AM
BLD00-00665 FIRE-Final Inspection11/20/200211/21/200211/21/2002 12:00:00 AMAPASS
Earl, ###-####
BLD00-00668 FIRE-Final Inspection11/20/200211/21/200211/21/2002 12:00:00 AMAPASS
Earl, ###-####
BLD00-00669 FIRE-Final Inspection11/20/200211/21/200211/21/2002 12:00:00 AMAPASS
Earl, ###-####
FIR01-00124 INSP-Supply line flush11/20/200211/21/200211/21/2002 12:00:00 AMAPASS
supply line flush is ok. The main city line appears to be full of rust. 11/21/2002 10:25:22 AM
MIS02-00302 FIR-Final11/20/200211/21/200211/21/2002 12:00:00 AMAPASS
fire life/safety finaled 11/21/2002 11:38:31 AM
BLD02-02453 FIRE-Final Inspection11/20/200211/21/200211/21/2002 12:00:00 AMANR
contractor does not have letter of approval from dave miller yet 11/22/2002 7:54:39 AM
BLD02-02263 FIRE-Final Inspection11/21/200211/21/200211/21/2002 12:00:00 AMPPASS
fire life/safety ok. No office doors or hardware have been installed yet and will have to be verified by the structural inspector 11/21/2002 2:01:55 PM
BLD02-02637 FIRE-Final Inspection11/21/200211/21/200211/21/2002 12:00:00 AMPFAIL
remove the thumbturn on the main exit, provide approved door hardware on the restroom doors 11/21/2002 2:28:36 PM
BLD02-02637 FIRE-Final Inspection11/21/200211/21/200211/21/2002 12:00:00 AMPFAIL
remove the thumbturn on the main exit, provide approved door hardware on the restroom doors 11/21/2002 2:28:36 PM
FIR01-00124 INSP-Final Inspection11/20/200211/21/200211/21/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 11/20/2002 at 11:55:17. Contact: ###-####.