Inspections for the day of: Friday, November 21, 2003.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR03-00279 INSP-Final Inspection11/20/200311/21/200311/21/2003 1:35:49 PMPCANC
This is Grants cell; Phone #: ###-#### Internet Inspection Request from: Terry Owsley Inspection cancelled from web by: Terry Owsley
FIR03-00671 INSP-Final Inspection11/20/200311/21/200311/21/2003 12:00:00 AMAPASS
shawn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIR03-00596 INSP-Sprinkler Rough-in/Hydro11/20/200311/21/200311/21/2003 12:00:00 AMAPART
hard lid areas ok to cover on the first floor 11/21/2003 11:05:49 AM
FIR03-00600 INSP-Sprinkler Rough-in/Hydro11/20/200311/21/200311/21/2003 12:00:00 AMAPASS
24 hour air test is ok 11/21/2003 12:50:32 PM
FIR03-00599 INSP-Final Inspection11/20/200311/21/200311/21/2003 12:00:00 AMAPART
sprinkler piping is ok to cover 11/21/2003 10:32:46 AM
BLD02-00420 FIRE-Conference11/20/200311/21/200311/21/2003 12:00:00 AMADONE
Advised contractor that outside canopy needs to be sheeted with noncombustible material or sprinkler protection will need to be provided. He agreed to provide sheet rock 11/21/2003 9:24:18 AM
FIR03-00600 INSP-Final Inspection11/20/200311/21/200311/21/2003 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 11/20/2003 at 2:48:02 PM. Contact: ###-####.
BLD02-02976 FIRE-Final Inspection11/20/200311/21/200311/21/2003 12:00:00 AMAFAIL
Dan; Phone #: ###-#### I spoke with dan about the requirement a fire sprinkler permit. All life safety items in the scope of work are ok when its time to final 11/21/2003 1:40:03 PM
BLD03-00174 FIRE-Final Inspection11/20/200311/21/200311/21/2003 12:00:00 AMAPASS
life safety finaled 11/21/2003 9:54:51 AM
BLD03-01991 FIRE-Final Inspection11/20/200311/21/200311/21/2003 12:00:00 AMAPASS
life safety finaled 11/21/2003 9:55:02 AM
FIR03-00558 INSP-Conference11/21/200311/21/200311/21/2003 12:00:00 AMADONE
2nd floor conference room is ok to occupy but the 2nd floor office area will need an inspection before occupancy 11/21/2003 9:07:09 AM
FIR03-00558 INSP-Conference11/21/200311/21/200311/21/2003 12:00:00 AMADONE
2nd floor conference room is ok to occupy but the 2nd floor office area will need an inspection before occupancy 11/21/2003 9:07:09 AM
FIR03-00342 INSP-Final Inspection11/19/200311/21/200311/21/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/19/2003 at 10:40:05 AM. Contact: ###-####.
FIR03-00662 INSP-Final Inspection11/21/200311/21/200311/21/2003 12:00:00 AMPFAIL
Plans do not match the installed sprinkler piping. There is up to 5 sprinkler pendants off of a 1" branchline. Need to resubmit. 11/21/2003 3:12:12 PM
BLD03-02103 FIRE-Final Inspection11/21/200311/21/200311/21/2003 12:00:00 AMPPASS
fire life safety finaled 11/21/2003 3:10:06 PM
FIR02-00432 INSP-Final Inspection11/21/200311/21/200311/21/2003 12:00:00 AMPPASS
finaled 7-3-2003
BLD03-00514 FIRE-Conference11/20/200311/21/200311/21/2003 12:00:00 AMPDONE
I went over the life safety notes with the contractor and also notified him he is missing the door closures for the apartments. I verified this with Mike Philips 11/21/2003 4:38:30 PM